3.11.5 Sign Off
The commissioning certificate must be signed by the commissioning engineer, with a copy sent
to Warmflow and a copy to remain with the appliance.
All product warranties will be invalidated if the appliance is not commissioned by a
Warmflow engineer or other trained and competent engineer and the combined
installation/commissioning certificate (See Section 0 of this manual) returned to Warmflow
within 30 days from the date of installation and 90 days from the date code stamped on the
appliance.
3.12 System Hand Over
After installation and commissioning has been completed, a handover package should be
completed by the installer and delivered to the house holder. This handover package will include
the following:
Instructions explaining the operation of the complete system (this user manual).
Final plans of the system layout to include; heating circuit design together with all
equipment and piping used.
Electrical Schematic of sensor and input/output connections outside of the heat pump unit.
The results of commissioning tests.
Contact details of the installer.
The installer should explain the components of the handover package to the householder.
3.13 Servicing
3.13.1
Servicing Schedule
The appliance must be serviced at least annually or as indicated by the user interface controller
(whichever occurs sooner) by a Warmflow Engineer or other competent Engineer. This is
necessary in order to optimise performance of the appliance and to ensure its efficiency and
safety for the user.
The below table is a typical list of service operations, however it is not exhaustive.
Item
Inspect
Clean
Test
Electrical Connections
Heating Circuit Filter
Inhibitor Concentration of Heating Solution
Glycol Concentration of Heating System*
Heating Circuit Pressure
Heating Manifold
Heating Pipework & Sealing
Heating Circuit Safety Devices
Heating Flow Rate
Insulation Inside Unit
Replace any defective components if necessary.
Summary of Contents for A Series
Page 36: ...Page 34 Figure 24 AS02 R32 Casing Dimensions Heating Connection Locations FRONT SIDE TOP...
Page 40: ...Page 38 Figure 26 Heating DHW Schematic Figure 27 Heating Only Schematic...
Page 70: ...Page 68 7 APPENDIX B WIRING DIAGRAMS...
Page 71: ...Page 69...
Page 72: ...Page 70 This page is intentionally left blank...
Page 74: ...Page 72 This page is intentionally left blank...
Page 76: ...Page 74...
Page 77: ...Page 75...
Page 78: ...Page 76...
Page 79: ...Page 77...
Page 80: ...Page 78...
Page 81: ...Page 79...
Page 82: ...Page 80...
Page 83: ...Page 81...
Page 84: ...Page 82...
Page 85: ...Page 83...
Page 86: ...Page 84...
Page 87: ...Page 85...
Page 88: ...Page 86...