
20
2
SEP.QE_SEPCOM_SIP-BED-EASY--.M.A3.0722.EN Issue: A3
07.22
4.0 SETTING THE OPERATING PANEL & USE
QE SEPCOM SIP BED EASY
4.1.3.3 Technician settings
On this page you can act on the parameters that control the operating logics of the pneumatic system, adjust
the automatic cycle, set the scheduled maintenance, view the version of the software installed, enable/disable
the “agitator” user, choose between level-based or activation-based operation from external signal, and also
reset the software to the factory settings.
no.
Description
Default value
1
Previous page
-
2
Grease nipple operation days / days left before maintenance is required
60 days
3
Separator screen operation hours / hours left before maintenance is required
1000 h
4
SEPCOM separator screen screw operation hours / hours left before mainte-
nance is required
2000 h