background image

12

13

Classifications and Ratings

Safety Instructions

GETTING STARTED

Type of system earthing:  

Nature of short-circuit protective device(s):  

Measures for protection against electric shock: 

Protection against electric shock:
Insulation: 

Response time of the interface switch:

 

Impact degree:
Ingress Protection: 

Information Exchange: (controlled 
by the NS protection):

Three phase system, neutral and PE are 
connected to the ground (TNS system).
100A curve D SCPD (Short-
Circuit Protection Device)
Safety grounding & Electrical 
Isolation. Basic protection.
Class II equipment.
Isolated D.C. EV charging station by 
means of reinforced insulation.
Response time of the interface switch 
(controlled by the NS protection) 20 ms.

Other
IK10 for structure and IK8 for touchscreen
IP54 for main unit, IP45 for Hose 
and cable connector.
EV supply equipment can’t exchange 
information with installation regarding the 
request and presence for ventilation.

Safety Instructions

GETTING STARTED

Safety Icons
A.

Hot surface, risk of burn.  
Some internal components 
of Supernova can remain hot 
long after the power supply 
has been disconnected. 
Make sure that the components have 
cooled down before disassembly, 
repair or replace them.

B.

Flying debris, risk of injury. 
Flying debris may cause eye, head 
and ear injuries. Workers need 
to be very careful when at risk.

C.

Heavy object, risk of injurious 
strains. 
Take into consideration 
that the components of 
Supernova can be very heavy. 
Be careful when lifting them in 
order to avoid back injuries. 

Caution. Follow all the safety and 
installation instructions carefully. 
Failure to follow instructions 
may be a safety hazard and/or 
cause equipment malfunction. 

D.

H.

Special waste treatment.
To protect public health and 
environment, make sure that 
your special waste is transported 
by a registered waste carrier 
at authorised sites. 

G.

Ground earth connection 
required.
Take care to ground 
electrical currents to protect your 
appliances and home from surges in 
electricity. If your electrical system 
is grounded, all of the electricity 
in excess will go into the earth. 

E.

Sharp element, risk of injurious 
cuts. 
Take care to avoid 
injuries from sharp elements.

F.

Risk of electric shock. Disconnect 
and wait 10 minutes.
 Installation 
and maintenance must be carried 
out only when the power is off. 
Switch off the main switch of 
Supernova before proceeding 
and make sure that the electrical 
power is disconnected. 
Supernova works at high 
electrical voltage, so only qualified 
personnel are permitted to install 
and maintain its components. 
Consequently, do not allow 
unqualified personnel to go near it. 

I.

Risk of foot crush. Be careful 
during the assembling and 
disassembling components 
that they do not crush a 
human body or body part.

Summary of Contents for Supernova

Page 1: ...Supernova INSTALLATION MANUAL...

Page 2: ...ed Tools 15 TRANSPORT AND UNPACKING 16 Transport 16 Unpacking 17 PRODUCT DESCRIPTION AND SITE PREPARATION 20 External view 20 Internal view 21 Site Space Requirements 22 Cable Reach 23 Table of conten...

Page 3: ...ractable system 1 Weight Storage Temperature Operational Noise Level Humidity Operating Temperature Power Balancing Power Split Cooling System Charging Compliance Safety Compliance Cybersecurity Compl...

Page 4: ...GERS S L U All rights reserved Copyright Nameplate Depending on the configuration of the charging station a nameplate will be located on the device Manufacturer Contact and Information GETTING STARTED...

Page 5: ...main service power from the charger before cleaning the unit Do not use cleaning solvents to clean any part of the charger Clean it with a clean dry cloth to remove dust and dirt accumulation Use the...

Page 6: ...ee Electromagnetic compatibility EMC classification EV supply equipment connection Charging Mode Intended Use Fixed parts Floor Standing Assembly Stationary equipment mounted on concrete Indoor and ou...

Page 7: ...d ear injuries Workers need to be very careful when at risk C Heavy object risk of injurious strains Take into consideration that the components of Supernova can be very heavy Be careful when lifting...

Page 8: ...x7 H Washer M16 x2 K Support Entry Plate L Membrane Entry Plate x5 Required Tools GETTING STARTED The following tools required for the installation of Supernova are recommended for the Supernovas ins...

Page 9: ...ot to damage the charging point IMPORTANT Make sure that the charger is stable on the forklift before moving it Supernova can be transported also with a crane In this specific case remove the external...

Page 10: ...harger L1 L2 L3 L4 L1 L2 L3 N PE PE Unpacking TRANSPORT AND UNPACKING 5 L1 L2 L3 L4 L1 L2 L3 N PE PE Unpack the EV guns and plug them in the holsters Then unpack the installation kit 6 Carefully lift...

Page 11: ...cess Key Lock Air intake Product Label Equivalet for EV Cable 2 is located on the other side The images below show the different connections of the divide from the outside Internal view PRODUCT DESCRI...

Page 12: ...cilitate possible maintenance operations The image below shows the recommended minimum distance needed to perform the installation 64 cm 38 cm 38 cm 38 cm Cable Reach PRODUCT DESCRIPTION AND SITE PREP...

Page 13: ...4 L1 L2 L3 N PE PE Introduction L1 L2 L3 L4 L1 L2 L3 N PE PE L1 L2 L3 N L1 L2 L3 N PE PE L1 L2 L3 L4 L1 L2 L3 N PE PE Door and Keys Instructions PRODUCT DESCRIPTION AND SITE PREPARATION 2 1 4 3 L1 L2...

Page 14: ...f the Supernova use the foundation kit template and concrete base To perform the electrical connection make sure not to cut the tube at the sole level to avoid the water penetrating into the charger i...

Page 15: ...ling the base Civil Works MECHANICAL INSTALLATION 1 2 Dig a hole respecting the minimum dimensions of the template It is recommended to leave an extra volume around the template The resulting depth sh...

Page 16: ...lean the excess of the product with some cardboard to spread it around 6 Let the product dry completely 7 At this point place the upper plate and place the charger using a forklift or a crane in corre...

Page 17: ...it above the four rods that protrude from the ground 4 Close only the side door to facilitate the process IMPORTANT Close the doors carefully pushing them steadily to make sure that the electrical co...

Page 18: ...L3 N L1 L2 L3 N PE PE L1 L2 L3 N L1 L2 L3 N PE PE Grid Connection ELECTRICAL INSTALLATION Assembly Part Size Quantity Tools recommended Electrical Cabinet 5 Screws M8 5 Hexagon socket wrench for M8 Ma...

Page 19: ...irement in the data sheet L1 L2 L3 N L1 L2 L3 N PE PE Grid Connection ELECTRICAL INSTALLATION 5 Screw the crimped terminals to L1 L2 L3 N and PE 6 Before closing the electrical protection ensure that...

Page 20: ...vervoltage protection of 20 Vn Nominal Voltage will be necessary The dimensions of the wiring must comply with the regulations and standards in force in the country of installation To calculate the mi...

Page 21: ...nal screws on the sides of the Foot Covers Safety Torx for M6 REMEMBER The concrete shall never exceed the upper level plate to ensure that Supernova anchors on a flat surface Close all doors carefull...

Page 22: ...42 43...

Page 23: ...support wallbox com V 1 0...

Reviews: