Grid Connection
ELECTRICAL INSTALLATION
The electrical connection is the costumer’s responsibility and
should be carried out by a qualified professional.
The Supernova must be connected to an electrical network with the
following specifications: (3P + N + PE): 400/230 V +/- 10%; 50 Hz.
L1 L2
L3 N
L1 L2
L3 N PE
PE
L1 L2
L3 N
L1 L2 L3
N PE
PE
Grid Connection
ELECTRICAL INSTALLATION
Assembly
Part
Size
Quantity
Tools recommended
Electrical
Cabinet
5 Screws
M8
5
Hexagon socket wrench
for M8
Material
1.
Locate the power input access at the bottom of the charging point.
2.
Put the cables through the waterproofing rubber
and anchor back the cable-entry frame.
REMEMBER
In case it is needed, Wallbox recommends to
unscrew the M5 x12 with an Allen Key M5.
L1 L2
L3 N
L1 L2 L3
N PE
PE