Purpose and Scope  

of the Document

The purpose and scope of this document is to introduce Supernova fast 
charging station and to outline the instructions for its correct installation. 
The instructions included in this installation guide are for professionals 
responsible to install, operate and maintain Supernova. Knowing and 
understanding EV and electrical power is crucial to carry out the installation.

Datasheet

GETTING STARTED

INSTALLATION MANUAL SUPERNOVA

453 mm

714 mm

2000 mm

868 mm

Ad-Hoc Payment

Authentication

Backend Communication Protocol

User Interface

Credit Card Reader* 

[1]

: 3-in-1 contactless (including Apple/Android Pay), chip, magnetic, Screen QR code

App (OCPP) / RFID (MI-FARE ISO/IEC14443A/B, ISO/IEC15693, ISO/IEC18000-3, FeliCa, NFC)

OCPP 1.6J

10” Anti-vandal Colour Touch Display (sunlight readable), LED status lights

DC Connectors
Charging Protocol

CCS2, CHAdeMO
ISO15118 (including Plug&Charge*) 
CHAdeMO

Environmental Ratings

Power Extension

IP54, IK10, 2000 m altitude

Connect two 60 kW chargers to deliver up to 120 kW  
to one vehicle.*

 [1]

Cable Length
Connector Protection
Cable Management

3 m, 5 m

 [1]

Proprietary Locking System
Auto retractable system 

[1]

Weight

Storage Temperature

Operational Noise Level
Humidity

Operating Temperature

Power Balancing
Power Split

Cooling System

Charging Compliance
Safety Compliance

Cybersecurity Compliance

Accessibility
Branding Options

EMC Compliance

250 kg

-35ºC to 70ºC

< 55dBA
5% to 95% Non-condensing

-35ºC to 50ºC

Local static and dynamic load balancing*

 [1]

Simultaneous charge of 2 outputs* 

[1]

Active air cooling

CCS (DIN 70121, ISO15118), IEC 61851-1, IEC 61851-23, IEC 61851-21-2, CHAdeMO 1.2 Certified
CE, IEC
CE, IEC
LINCE*

Wheelchair access appropriate, Environmental light
Artwork Templates

Output Power

60 kW
Up to 97%
>0.98
5%

150 A

150-500 V 

Output Current

Output Voltage

Nominal Efficiency
Power Factor
THD

Supply Input Voltage

400 ± 10%, 50 Hz

Connectivity

Supply Input Current
Electrical Protections

Ethernet, 2G/3G/4G/LTE, Space for external router (DIN rail)

91 A
Grid disconnection, MCB, Surge Arrestor

Metering

Commissioning Interface

Diagnostics

AC MID

 [1]

, DC Eichrecht (German calibration law)*

 [1]

Local (via Ethernet and without extra software) and remote webmanager
Schuko 230V
Auto-diagnostics system

www.wallbox.com

Specifications are subject to change to improve design, function and others.
*Contact your sales representative regarding availability.
[1] Optional.

Dimension with holster

2000 x 453 x 868 mm

Dimension without holster

2000 x 453 x 714 mm

Summary of Contents for Supernova

Page 1: ...Supernova INSTALLATION MANUAL...

Page 2: ...ed Tools 15 TRANSPORT AND UNPACKING 16 Transport 16 Unpacking 17 PRODUCT DESCRIPTION AND SITE PREPARATION 20 External view 20 Internal view 21 Site Space Requirements 22 Cable Reach 23 Table of conten...

Page 3: ...ractable system 1 Weight Storage Temperature Operational Noise Level Humidity Operating Temperature Power Balancing Power Split Cooling System Charging Compliance Safety Compliance Cybersecurity Compl...

Page 4: ...GERS S L U All rights reserved Copyright Nameplate Depending on the configuration of the charging station a nameplate will be located on the device Manufacturer Contact and Information GETTING STARTED...

Page 5: ...main service power from the charger before cleaning the unit Do not use cleaning solvents to clean any part of the charger Clean it with a clean dry cloth to remove dust and dirt accumulation Use the...

Page 6: ...ee Electromagnetic compatibility EMC classification EV supply equipment connection Charging Mode Intended Use Fixed parts Floor Standing Assembly Stationary equipment mounted on concrete Indoor and ou...

Page 7: ...d ear injuries Workers need to be very careful when at risk C Heavy object risk of injurious strains Take into consideration that the components of Supernova can be very heavy Be careful when lifting...

Page 8: ...x7 H Washer M16 x2 K Support Entry Plate L Membrane Entry Plate x5 Required Tools GETTING STARTED The following tools required for the installation of Supernova are recommended for the Supernovas ins...

Page 9: ...ot to damage the charging point IMPORTANT Make sure that the charger is stable on the forklift before moving it Supernova can be transported also with a crane In this specific case remove the external...

Page 10: ...harger L1 L2 L3 L4 L1 L2 L3 N PE PE Unpacking TRANSPORT AND UNPACKING 5 L1 L2 L3 L4 L1 L2 L3 N PE PE Unpack the EV guns and plug them in the holsters Then unpack the installation kit 6 Carefully lift...

Page 11: ...cess Key Lock Air intake Product Label Equivalet for EV Cable 2 is located on the other side The images below show the different connections of the divide from the outside Internal view PRODUCT DESCRI...

Page 12: ...cilitate possible maintenance operations The image below shows the recommended minimum distance needed to perform the installation 64 cm 38 cm 38 cm 38 cm Cable Reach PRODUCT DESCRIPTION AND SITE PREP...

Page 13: ...4 L1 L2 L3 N PE PE Introduction L1 L2 L3 L4 L1 L2 L3 N PE PE L1 L2 L3 N L1 L2 L3 N PE PE L1 L2 L3 L4 L1 L2 L3 N PE PE Door and Keys Instructions PRODUCT DESCRIPTION AND SITE PREPARATION 2 1 4 3 L1 L2...

Page 14: ...f the Supernova use the foundation kit template and concrete base To perform the electrical connection make sure not to cut the tube at the sole level to avoid the water penetrating into the charger i...

Page 15: ...ling the base Civil Works MECHANICAL INSTALLATION 1 2 Dig a hole respecting the minimum dimensions of the template It is recommended to leave an extra volume around the template The resulting depth sh...

Page 16: ...lean the excess of the product with some cardboard to spread it around 6 Let the product dry completely 7 At this point place the upper plate and place the charger using a forklift or a crane in corre...

Page 17: ...it above the four rods that protrude from the ground 4 Close only the side door to facilitate the process IMPORTANT Close the doors carefully pushing them steadily to make sure that the electrical co...

Page 18: ...L3 N L1 L2 L3 N PE PE L1 L2 L3 N L1 L2 L3 N PE PE Grid Connection ELECTRICAL INSTALLATION Assembly Part Size Quantity Tools recommended Electrical Cabinet 5 Screws M8 5 Hexagon socket wrench for M8 Ma...

Page 19: ...irement in the data sheet L1 L2 L3 N L1 L2 L3 N PE PE Grid Connection ELECTRICAL INSTALLATION 5 Screw the crimped terminals to L1 L2 L3 N and PE 6 Before closing the electrical protection ensure that...

Page 20: ...vervoltage protection of 20 Vn Nominal Voltage will be necessary The dimensions of the wiring must comply with the regulations and standards in force in the country of installation To calculate the mi...

Page 21: ...nal screws on the sides of the Foot Covers Safety Torx for M6 REMEMBER The concrete shall never exceed the upper level plate to ensure that Supernova anchors on a flat surface Close all doors carefull...

Page 22: ...42 43...

Page 23: ...support wallbox com V 1 0...

Reviews: