28
29
3.
4.
Position the level plate and let it
adhere according to the specified
measurements. Before placing the
Supernova, the top metal plate must
be perfectly level, always above the
concrete surface, not submerged.
Before filling the base with concrete,
make sure to protect the upper plate
with some masking tape to facilitate the
process of removing the nuts from it.
Civil Works
MECHANICAL INSTALLATION
40
23
655
400
R30
R4
0
210
4x Ø20
280
IMPORTANT
Make sure the cable is well positioned
and routed before filling the base.
Civil Works
MECHANICAL INSTALLATION
1.
2.
Dig a hole, respecting the minimum
dimensions of the template. It is
recommended to leave an extra volume
around the template. The resulting depth
should be less than 0.45 m. It is important
that the cables are loose enough and that
they protrude a minimum of 0.75 m
above the surface to allow a proper
connection to the charging point.
Assemble the whole foundation. First, attach
one of the level plates to one end of the bars
using 8 M16 nuts (4 above each plate hole,
and 4 below each plate hole). Subsequently,
attach the upper level plate using 4 M156
washers and 4 m16 nuts. The rest of the
washers and nuts is going to be used for
anchoring the charger to the ground.