Preliminary Considerations

GETTING STARTED

Safety Instructions

Legal Notice and Liability

•  This document contains information about one or more WALLBOX CHARGERS products and 

may include a description of or a reference to one or more standards that may be generally 
relevant to the WALLBOX products. The presence of any such description of a standard or 
reference to a standard is not a representation that all of the WALLBOX products referenced 
in this document support all of the features of the described or referenced standard. In 
order to determine the specific features supported by a particular WALLBOX product, the 
reader should consult the product specifications for the particular WALLBOX product.

•  WALLBOX may have one or more patents or pending patent applications protecting 

the intellectual property in the WALLBOX products described in this document.

•  The information in this document is subject to change without notice and 

should not be construed as a commitment by WALLBOX. WALLBOX assumes 
no responsibility for any errors that may appear in this document.

GETTING STARTED

•  Any resulting damage due to disregard or actions contrary to the 

instructions in this manual is excluded from the product warranty.

•  Do not use this product if the connector is broken, cracked, open or shows 

any other indication of damage. Please contact your distributor.

•  The installation maintenance and servicing of the Wallbox device must be performed 

only by qualified personnel in accordance with applicable local regulations. Unauthorised 
installation and modifications make the manufacturer warranty void. 

•  Protect your Wallbox device from any external impact.
•  Do not use your Wallbox charger under adverse climatic conditions. 
•  Do not open the cover in the rain. 
•  Do not touch the charging cable if the connector emits smoke 

or begins to melt. If possible, stop the charging. 

•  Take appropriate precautions with electronic medical implants. 
•  Disconnect the main service power from the charger before cleaning the 

unit. Do not use cleaning solvents to clean any part of the charger. Clean 
it with a clean, dry cloth to remove dust and dirt accumulation. 

•  Use the Wallbox charger under the specified operating 

parameters and within normal ambient conditions. 

•  The charger can be installed up to 2000 m.

Read carefully these instructions before carrying out the installation.
•  The charging point must not be installed in places where there may be a risk of explosion.
•  Do not install the charging point in places where objects can fall and damage the equipment.
•  Install the charging point on a surface resistant to mechanical forces.
•  Disconnect the charger from the mains when repair work and 

manipulation of the equipment are carried out. 

•  Only authorised and qualified personnel may access the 

electrical parts located inside the charging point.

•  The input power line for the charging point must be connected directly from a 

distribution panel to the charging point with a dedicated individual circuit and 
comply with the electrical safety regulations applicable in your country.

•  The sizing of the input power cable of the charging point must be verified by a qualified 

electrician. Note that there are various factors that can influence the choice of cable, including 
the distance between the distribution panel and the charging point, the maximum input current 
of the Supernova, the installation mode and the conductor material. The company in charge of 
the installation will be responsible for sizing the section of the cables and electrical protections. 

•  Upon receiving the charging point, check it carefully to verify 

that no damage has occurred during shipment.

•  All the processes of unloading and handling of the charging point must be carried out and 

supervised by qualified personnel who take into account the considerable weight of the 
equipment, comply with the safety regulations and use the appropriate support points.

•  Once the charging point is unloaded from the truck, use a 

forklift to move the equipment to its location.

•  The content of the packaging is fragile, do not stack one Supernova on the other.

Summary of Contents for Supernova

Page 1: ...Supernova INSTALLATION MANUAL...

Page 2: ...ed Tools 15 TRANSPORT AND UNPACKING 16 Transport 16 Unpacking 17 PRODUCT DESCRIPTION AND SITE PREPARATION 20 External view 20 Internal view 21 Site Space Requirements 22 Cable Reach 23 Table of conten...

Page 3: ...ractable system 1 Weight Storage Temperature Operational Noise Level Humidity Operating Temperature Power Balancing Power Split Cooling System Charging Compliance Safety Compliance Cybersecurity Compl...

Page 4: ...GERS S L U All rights reserved Copyright Nameplate Depending on the configuration of the charging station a nameplate will be located on the device Manufacturer Contact and Information GETTING STARTED...

Page 5: ...main service power from the charger before cleaning the unit Do not use cleaning solvents to clean any part of the charger Clean it with a clean dry cloth to remove dust and dirt accumulation Use the...

Page 6: ...ee Electromagnetic compatibility EMC classification EV supply equipment connection Charging Mode Intended Use Fixed parts Floor Standing Assembly Stationary equipment mounted on concrete Indoor and ou...

Page 7: ...d ear injuries Workers need to be very careful when at risk C Heavy object risk of injurious strains Take into consideration that the components of Supernova can be very heavy Be careful when lifting...

Page 8: ...x7 H Washer M16 x2 K Support Entry Plate L Membrane Entry Plate x5 Required Tools GETTING STARTED The following tools required for the installation of Supernova are recommended for the Supernovas ins...

Page 9: ...ot to damage the charging point IMPORTANT Make sure that the charger is stable on the forklift before moving it Supernova can be transported also with a crane In this specific case remove the external...

Page 10: ...harger L1 L2 L3 L4 L1 L2 L3 N PE PE Unpacking TRANSPORT AND UNPACKING 5 L1 L2 L3 L4 L1 L2 L3 N PE PE Unpack the EV guns and plug them in the holsters Then unpack the installation kit 6 Carefully lift...

Page 11: ...cess Key Lock Air intake Product Label Equivalet for EV Cable 2 is located on the other side The images below show the different connections of the divide from the outside Internal view PRODUCT DESCRI...

Page 12: ...cilitate possible maintenance operations The image below shows the recommended minimum distance needed to perform the installation 64 cm 38 cm 38 cm 38 cm Cable Reach PRODUCT DESCRIPTION AND SITE PREP...

Page 13: ...4 L1 L2 L3 N PE PE Introduction L1 L2 L3 L4 L1 L2 L3 N PE PE L1 L2 L3 N L1 L2 L3 N PE PE L1 L2 L3 L4 L1 L2 L3 N PE PE Door and Keys Instructions PRODUCT DESCRIPTION AND SITE PREPARATION 2 1 4 3 L1 L2...

Page 14: ...f the Supernova use the foundation kit template and concrete base To perform the electrical connection make sure not to cut the tube at the sole level to avoid the water penetrating into the charger i...

Page 15: ...ling the base Civil Works MECHANICAL INSTALLATION 1 2 Dig a hole respecting the minimum dimensions of the template It is recommended to leave an extra volume around the template The resulting depth sh...

Page 16: ...lean the excess of the product with some cardboard to spread it around 6 Let the product dry completely 7 At this point place the upper plate and place the charger using a forklift or a crane in corre...

Page 17: ...it above the four rods that protrude from the ground 4 Close only the side door to facilitate the process IMPORTANT Close the doors carefully pushing them steadily to make sure that the electrical co...

Page 18: ...L3 N L1 L2 L3 N PE PE L1 L2 L3 N L1 L2 L3 N PE PE Grid Connection ELECTRICAL INSTALLATION Assembly Part Size Quantity Tools recommended Electrical Cabinet 5 Screws M8 5 Hexagon socket wrench for M8 Ma...

Page 19: ...irement in the data sheet L1 L2 L3 N L1 L2 L3 N PE PE Grid Connection ELECTRICAL INSTALLATION 5 Screw the crimped terminals to L1 L2 L3 N and PE 6 Before closing the electrical protection ensure that...

Page 20: ...vervoltage protection of 20 Vn Nominal Voltage will be necessary The dimensions of the wiring must comply with the regulations and standards in force in the country of installation To calculate the mi...

Page 21: ...nal screws on the sides of the Foot Covers Safety Torx for M6 REMEMBER The concrete shall never exceed the upper level plate to ensure that Supernova anchors on a flat surface Close all doors carefull...

Page 22: ...42 43...

Page 23: ...support wallbox com V 1 0...