Set Up Procedure 

Every System is different!

1. Inspect the system design drawings,

compare with all the parts received.

2. Inspect all the locations of where the

components will be installed, look for:
(a) Proper support points.
(b) Obstructions

3. Starting at the Central Vac's main

components install and anchor the hanger
manifold.

4. Install the airlock and fasten it to the

hanger manifold.

5. Run a bead of silicone around the top lip

of the airlock,
and then
position the
primary separator with the 6” outlet port facing towards the
secondary separator.

6. Install the secondary separator. 

(a) Ensure that silicone is applied between any of the 

secondary separator parts.

7. Install the 6” pipe and 6” compression couplers in between

the separators.

8. Along the side of the hanger manifold, install the filter 

housing.
(a) Install the filter inside the basket at the bottom of the 

filter cannister.

9. Run the 6” piping along with the 6” elbows and 6” 

compression couplers from the secondary separator, out 
of the top, down to the inlet port on the side of the filter 
housing.

10.Place the Blower package close to the hanger manifold 

and run your 6” piping from the top of the filter housing to 
the blower inlet.

11. Refer to the supplied system drawing to map out the 

location of the piping. 

12.When joining piping, ensure that the grounding strip is 

present on all compression couplers. Do not leave gaps 
between piping sections or between piping and elbows. 
Gaps will lead to premature wear of piping and create 
holes in couplers and gaskets. 

13. For ease in maintenance install all compression couplings facing the same way. 

(a) This created minimal movement when removing any couplings.

14. When installing the camlock couplings, ensure that the dust cap is installed and 

clamped on, before applying silicone to the piping and installing the camlock coupling.

Summary of Contents for Central Vac

Page 1: ...INSTALLATION MANUAL Central Vac Installation Manual...

Page 2: ......

Page 3: ...USA 1 800 466 1197 ext 8 Email warranty usa walinga com Australia 07 4634 7344 Email mail customvac com au GUELPH SERVICE Kevin VanderZwaag 519 763 7000 ext 273 kevin vanderzwaag walinga com ORIGINAL...

Page 4: ...preventing injury Wear the appropriate protective gear Ensure that the Central Vac is anchored to firm and level ground Make certain that sufficient amperage at the proper voltage and frequency 60Hz i...

Page 5: ...Components of a Central Vac System 1 2 3 4 5...

Page 6: ...Typical Central Vac Set Up...

Page 7: ...he tank towards the airlock 55 high X 19 diameter Where gaskets are not available use silicon to seal between components in order to maintain a constant vacuum The Primary Separator is bolted onto the...

Page 8: ...motor and chain drive and has to be placed in an easily accessible location for service 3 Secondary Receiver Separator Placed after the primary separator the secondary separator operates the same way...

Page 9: ...needs to be mated bolted and siliconed together A full seal is required to maintain constant vacuum The secondary separator will also have two ports both 6 diameter The 6 pipe heading out of the top...

Page 10: ...e obstructed 31 3 8 high and 25 1 2 wide The 6 port coming out of the top of the filter housing will lead towards the blower package 5 Blower Package The blower package generates the suction and press...

Page 11: ......

Page 12: ...unit will be equipped with a 3 mainline and 2 drop lines Galvanized steel elbows Used for corners in the piping system Available in 2 3 4 and 6 6 elbows are utilized between the blower filter housing...

Page 13: ...ound strip is put into place in order to prevent static electricity build up Mounting Brackets The mounting brackets are mounted to the wall or to any other solid support The saddle clamps are attache...

Page 14: ...entral vac system and is used for by the operator Has a static wire built into it to prevent static electricity build up If servicing a rubber hose ensure that the ground wire is making contact with t...

Page 15: ...and to prevent connection leaks When installing a camlock coupling be sure to have a ring of silicone around the piping and have the coupler closed Camlocks must be installed with dust plugs inserted...

Page 16: ...e as straight as possible to maintain maximum conveying rate Space the inlets and the inlet piping at a maximum of 40 apart Or in accordance with piping layout drawing provided When installing the inl...

Page 17: ...components are easily accessible for any future service and maintenance Electro Static hazard warning labels must be installed on the piping by all inlets For ease in future maintenance install all t...

Page 18: ...Typical System Design...

Page 19: ...e filter inside the basket at the bottom of the filter cannister 9 Run the 6 piping along with the 6 elbows and 6 compression couplers from the secondary separator out of the top down to the inlet por...

Page 20: ...fer to sales contract Note As a rule Walinga Central Vac systems are equipped with Toshiba 3 phase electric motors Please refer to the sales contract for voltage and hp requirements or contact your lo...

Reviews: