9
Installation
NOTE: Measure burner operating pressure at manifold test
point with target top burner (Inner and outer ring)
operating at full setting.
7.
Turn ‘Off’ mains gas supply and bleed gas out of
appliance gas lines.
8.
Turn ‘On’ gas supply and appliance.
9.
Verify operating pressure remains correct.
Electrical Connection
NOTE: ALL ELECTRICAL CONNECTIONS MUST ONLY BE CARRIED OUT BY AN AUTHORISED
PERSON.
Each appliance should be connected to an adequately protected power supply and isolation switch mounted
adjacent to, but not behind appliance. This switch must be clearly marked and readily accessible in case of
fire.
1.
Check electricity supply is correct as shown on Rating Plate attached to lower front hand side of front
sill panel.
2.
Supply terminal connections are located at rear of appliance. Refer to ‘Electrical Connections’ in
‘Dimensions’ section of manual.
3.
Open oven door and remove oven control panel to allow connection access for electrical supply.
4.
Connect mains supply to L1, L2 and L3 connection terminals. Refer to 'Electrical Supply
Requirements' section for connection details.
NOTE: This appliance can be converted from 3 Phase to Single Phase supply by connecting single
phase input to L1 and adding a bridge wire between L1, L2 and L3 connections, (refer to Fig
4 overleaf and information shown in 'Electrical Supply Requirements Table' in
'Specifications' Section).
5.
Connect neutral and earth conductors to neutral stud and
earth stud respectively.
6.
For all connections ensure conductors are secure and
appropriately terminated.
7.
Tighten cable gland to secure against tension on cable.
8.
Check polarity of each connection is correct to mains
connection terminals markings on appliance.
Fig 3
Manifold Test
Point
T
HIS
APPLIANCE
MUST
BE
EARTHED
. I
F
SUPPLY
CORD
IS
DAMAGED
,
IT
MUST
BE
REPLACED
BY
A
SUITABLY
QUALIFIED
PERSON
IN
ORDER
TO
AVOID
A
HAZARD
.
Warning
Changing supply from 3 phase to single phase will increase electrical current
loading on supply cable. Ensure supply cable used is of a sufficient size for
current loading, refer to 'Electrical Supply Requirements' table.
Caution
Neutral supply
connection to N
Phase supply
connection to L1
P N
Fig 4
Add bridging
wires between
L1, L2 and L3.