40
TwinControl
.
B_02804
3
5
2
1
4
B_02805
OPERATING MANUAL
EDITION 04/2010
PART NO. DOC393831
Pos from
Cable
1
A-Pump to frame
4 mm
2
; AWG11
2
B-Pump to frame
4 mm
2
; AWG11
3
Flushing pump to frame
4 mm
2
; AWG11
4
Control unit to frame
4 mm
2
; AWG11
5
Frame to the functional earth
4 mm
2
; AWG11
To the equipotential bond-
ing (operational earth)
5.7.1
EARTHING OF COMPONENTS ON FRAME OR CARRIAGE
Earth connections
View of rear side of system
Earth connection point on frame
View of operating side of system