59
PROTEC 2K
OPERATING MANUAL
VERSION 02/2016
ORDER NUMBER DOC2352824
7.6.1
INTERMEDIATE FLUSHING WITH FLUSHING PUMP
1. Visual check: personal safety equipment, grounding and all devices ready to use.
Blue handle (3) at bottom. Red handle (12) at top. All circulation and return hoses are
secured and lead into the product tanks A or B.
2. If necessary, top up fl ushing agent.
3. Point the spray gun toward the grounded collecting tray and pull off .
4. Open fl ushing ball valve (30).
5. Flush until clean fl ushing agent exits the gun.
6. Close fl ushing ball valve (30).
7. Close and secure the spray gun.
Next steps
:
- Spraying (Chapter 7.4) or
- Paint change fl ushing (Chapter 7.7) or
- at the end of work:
1. Pressure relief (Chapter 7.5)
2. Relieve fl ushing pump (Chapter 7.6.1.1)
3. Switch off device (Chapter 7.3.2)
Flushing and circulation at the same time
If necessary, circulation can take place at the same time as intermediate fl ushing:
Adjust 2K air pressure regulator (1) to approx. 0.05 MPa; 0.5 bar; 7.3 psi.
Blue handle turned upward (circulation operating mode).
B_05299
B_05431
1
2
3
Red handle (spray) off .
Flush gun without nozzle.
Flushing ball valve on.
Secure the gun.
Intermediate fl ushing
(with fl ushing pump)
10
11
Summary of Contents for PROTEC 2K
Page 2: ......
Page 21: ...21 PROTEC 2K OPERATING MANUAL VERSION 02 2016 ORDER NUMBER DOC2352824...
Page 38: ...38 PROTEC 2K OPERATING MANUAL VERSION 02 2016 ORDER NUMBER DOC2352824...
Page 110: ...110 PROTEC 2K OPERATING MANUAL VERSION 02 2016 ORDER NUMBER DOC2352824...
Page 120: ...120 PROTEC 2K OPERATING MANUAL VERSION 02 2016 ORDER NUMBER DOC2352824...
Page 131: ......