24
PEM-X1
OPERATING MANUAL
VERSION 03/2014
ORDER NUMBER DOC 2326020
Procedure:
1. Switch off the high-voltage generation on the control unit.
2. Before connecting the spray gun, check that all components (such as the nozzle system
and union nut) are correctly fi tted.
3. Connect electrical cable of spray gun to control unit.
4. Connect the powder feed hose to the spray gun and to the powder injector.
5. Connect the atomizing air hose to the spray gun and to the control unit.
6.5
CONNECTING THE SPRAY GUN
Unintentional putting into operation!
Risk of injury.
Before any work on the device, in the event of work interruptions
and malfunctions:
Switch off the energy/compressed air supply.
Relieve spray gun and device pressure.
Secure the spray gun against actuation.
In the event of malfunctions, remedy the fault as described in
the "Troubleshooting" chapter.
WARNING