Operation
PT 6L
24
wc_tx001597gb.fm
4
Operation
4.1
Preparing the Machine for First Use
Preparing for first use
To prepare your machine for first use:
4.1.1
Make sure all loose packaging materials have been removed from the
machine.
4.1.2
Check the machine and its components for damage. If there is visible
damage, do not operate the machine! Contact your Wacker Neuson
dealer immediately for assistance.
4.1.3
Take inventory of all items included with the machine and verify that
all loose components and fasteners are accounted for.
4.1.4
Attach component parts not already attached.
4.1.5
Add fluids as needed and applicable, including fuel, engine oil, and
battery acid.
4.1.6
Move the machine to its operating location.
4.2
Control / Component Descriptions
See Graphic: wc_gr003183
Ref.
Description
Ref.
Description
1
Engine oil dipstick
14
Engine oil filter
2
Fuel filter
15
Battery box
3
Manual fuel pump lever
16
Trailer hitch
4
Engine oil drain plug
17
Jack stand
5
Engine throttle solenoid
18
Rear stabilizers
6
Control panel
19
Drain cover
7
Ignition switch
20
Front impeller cover
8
Hour meter
21
Suction port
9
Bearing/Seal housing
22
Priming cover
10
Lifting point
23
Discharge port
11
Engine oil fill cap
24
Fuel fill cap
12
Inspection cover
25
License plate holder
13
Air cleaner
26
Circuit breaker
Summary of Contents for PT 6L
Page 1: ...0154629en 008 0810 0 1 5 4 6 2 9 E N Operator s Manual Pump PT 6L ...
Page 8: ...8 wc_bo0154629en_008TOC fm Table of Contents PT 6L ...
Page 33: ...PT 6L Operation wc_tx001597gb fm 33 wc_gr003210 3 1 2 e g 3 1 2 d a b c f ...
Page 52: ...Technical Data PT 6L 52 wc_td000099gb fm 6 5 Dimensions wc_gr001154 ...
Page 58: ......
Page 59: ......
Page 60: ......
Page 61: ......
Page 62: ......
Page 63: ......
Page 64: ......
Page 65: ......
Page 66: ......
Page 67: ......
Page 68: ......
Page 69: ......
Page 70: ......
Page 71: ......