![Wacker Neuson PT 6L Operator'S Manual Download Page 41](http://html1.mh-extra.com/html/wacker-neuson/pt-6l/pt-6l_operators-manual_866638041.webp)
PT 6L
Maintenance
wc_tx001598gb.fm
41
5.9
Fan Belt
See graphic: wc_gr001190
Check the tension on the fan belt every 125 hours. Replace the fan belt
every 500 hours.
5.9.1
Remove the belt guard
(a)
and check the fan belt
(b)
for cracks or
splitting.
5.9.2
To tighten the fan belt, add or remove spacers
(c)
located between the
fan pulley halves
(d)
. Spacers are 0.5, 1.0, 2.0 mm (0.017, 0.034,
0.068 in.) thick.
5.9.3
To check fan belt tension, press the fan belt halfway between belt
pulleys with a 10 kg (22 lb.) load or strong thumb pressure. The fan belt
should deflect 1 cm (3/8 in.).
wc_gr001190
a
b
d
c
Summary of Contents for PT 6L
Page 1: ...0154629en 008 0810 0 1 5 4 6 2 9 E N Operator s Manual Pump PT 6L ...
Page 8: ...8 wc_bo0154629en_008TOC fm Table of Contents PT 6L ...
Page 33: ...PT 6L Operation wc_tx001597gb fm 33 wc_gr003210 3 1 2 e g 3 1 2 d a b c f ...
Page 52: ...Technical Data PT 6L 52 wc_td000099gb fm 6 5 Dimensions wc_gr001154 ...
Page 58: ......
Page 59: ......
Page 60: ......
Page 61: ......
Page 62: ......
Page 63: ......
Page 64: ......
Page 65: ......
Page 66: ......
Page 67: ......
Page 68: ......
Page 69: ......
Page 70: ......
Page 71: ......