![Wacker Neuson PT 6L Operator'S Manual Download Page 45](http://html1.mh-extra.com/html/wacker-neuson/pt-6l/pt-6l_operators-manual_866638045.webp)
PT 6L
Maintenance
wc_tx001598gb.fm
45
•
Remove the impeller cover.
•
Remove the screws that secure the insert to the impeller cover.
•
Add shims as required and recheck the clearance gap.
•
After the proper shimming has been determined, use a high-
strength threadlocking compound on the screws and secure the
shims and insert to the impeller cover. Torque the screws to 26
Nm (19 ft.lbs.).
5.13.7 Reinstall the suction flange and the flapper gasket.
Summary of Contents for PT 6L
Page 1: ...0154629en 008 0810 0 1 5 4 6 2 9 E N Operator s Manual Pump PT 6L ...
Page 8: ...8 wc_bo0154629en_008TOC fm Table of Contents PT 6L ...
Page 33: ...PT 6L Operation wc_tx001597gb fm 33 wc_gr003210 3 1 2 e g 3 1 2 d a b c f ...
Page 52: ...Technical Data PT 6L 52 wc_td000099gb fm 6 5 Dimensions wc_gr001154 ...
Page 58: ......
Page 59: ......
Page 60: ......
Page 61: ......
Page 62: ......
Page 63: ......
Page 64: ......
Page 65: ......
Page 66: ......
Page 67: ......
Page 68: ......
Page 69: ......
Page 70: ......
Page 71: ......