![Wacker Neuson PT 6L Operator'S Manual Download Page 11](http://html1.mh-extra.com/html/wacker-neuson/pt-6l/pt-6l_operators-manual_866638011.webp)
PT 6L
Safety Information
wc_si000524gb.fm
11
1.3.3
Never leave the machine running unattended.
1.3.4
Never operate this machine in applications for which it is not intended.
1.3.5
Do not open the priming plug when the pump is hot. Do not loosen or
remove inlet or discharge hose fittings when the pump is hot. Hot water
inside could be pressurized much like the radiator on an automobile.
Allow the pump to cool to the touch before loosening the plug and
before loosening or removing the inlet or discharge hose fittings.
1.3.6
NEVER position the pump on a loose, uneven, or unstable surface
where it can tip, roll, slide or fall! The pump must be secure before
operating. Position the pump on a firm, flat surface; adjust the trailer
jacks to be sure the pump is level and supported firmly.
1.3.7
NEVER open the pump housing cover while the pump is operating or
start the pump with the cover off. The rotating impeller inside the pump
can cut or sever objects caught in it.
1.3.8
NEVER block or restrict flow from the inlet line or the discharge line.
Remove kinks from the discharge line before starting the pump.
Operation with a blocked inlet line or discharge line can cause water
inside the pump to overheat.
1.3.9
NEVER reach into or insert anything into the pump while the engine is
on! The impeller inside the pump housing is turning at all times while
the engine is running.
1.3.10 DO NOT allow anyone to stand in front of the discharge port when
starting the engine or while priming the pump! The sudden out-rush of
water could push or knock a person down.
1.3.11 ALWAYS make sure the hose connections on the pump are tight. A
loose connection could cause water to spray or result in a hose falling
off the pump while it is in operation.
1.3.12 ALWAYS make sure the water stream from the pump discharge is not
directed in such a way so as to cause erosion to the surrounding
ground or damage or weakening of nearby structures!
Summary of Contents for PT 6L
Page 1: ...0154629en 008 0810 0 1 5 4 6 2 9 E N Operator s Manual Pump PT 6L ...
Page 8: ...8 wc_bo0154629en_008TOC fm Table of Contents PT 6L ...
Page 33: ...PT 6L Operation wc_tx001597gb fm 33 wc_gr003210 3 1 2 e g 3 1 2 d a b c f ...
Page 52: ...Technical Data PT 6L 52 wc_td000099gb fm 6 5 Dimensions wc_gr001154 ...
Page 58: ......
Page 59: ......
Page 60: ......
Page 61: ......
Page 62: ......
Page 63: ......
Page 64: ......
Page 65: ......
Page 66: ......
Page 67: ......
Page 68: ......
Page 69: ......
Page 70: ......
Page 71: ......