![Wacker Neuson Cub 200 Repair Manual Download Page 43](http://html1.mh-extra.com/html/wacker-neuson/cub-200/cub-200_repair-manual_3123718043.webp)
Cub 200/300
Troubleshooting the Burner
ghi_tx001207gb.fm
43
Continued from the previous page.
6. Disconnect the light green wires
(e)
from terminals M5 and M6 of the burner
controller.
7. Measure the resistance of the cad cell by measuring across the light green
wires. Be sure the cad cell is exposed to light.
Note: The resistance value will vary depending on the amount of light the cad cell
receives.
Is 1000–5000 ohms measured?
8. Deprive the cad cell of light (cover the cad cell) and measure the resistance
again.
Note: With the cad cell covered, a much higher resistance should be measured.
Again, the amount will vary depending on the amount of light the cad cell receives.
Is 20,000–80,000+ ohms measured?
Result
The procedure to check the cad cell is now complete. Reconnect the cad cell.
Yes ____
No ____
Continue.
The cad cell is dirty or defective. First, clean the cad cell with
alcohol, then re-measure the resistance. If the reading remains
out of the range listed above, replace the cad cell.
Yes ____
No ____
The cad cell is OK.
The cad cell is dirty or defective. First, clean the cad cell with
alcohol, then re-measure the resistance. If the reading remains
out of the range listed above, replace the cad cell.
Summary of Contents for Cub 200
Page 1: ...Repair Manual Indirect Fired Air Heater Cub 200 Cub 300 0179422en 001 1009 0 1 7 9 4 2 2 E N...
Page 4: ...Foreword Cub 200 300 ghi_tx001204gb fm 4...
Page 15: ...Cub 200 300 Operation ghi_tx001205gb fm 15 Notes...
Page 59: ...Cub 200 300 Schematic ghi_tx001210gb fm 59 7 Schematic 7 1 Cub 200 Cub 300 Schematic...