wc_tx004194gb_FM10.fm
59
CRT48
General Maintenance
Continued from the previous page.
2. Position and align the blades.
■
If installing combination blades
(d),
orient the blades as shown in the
diagram and align the screw holes. This positions the raised edge of each
blade correctly for the rotation of each rotor.
■
If installing finish blades, simply align the screw holes. Blade orientation is
not critical with finish blades.
3. Coat the screw threads with bearing grease. A grease coating will prevent wet
concrete from cementing the screws in place. This step will also make blade
removal easier in the future.
4. Re-install the screws and tighten securely. Do not overtighten.
Result
The blades have now been changed.
Summary of Contents for CRT48-35V
Page 6: ...6...
Page 10: ...Table of Contents CRT48 10...
Page 19: ...wc_si000969gb_FM10 fm 19 CRT48 Safety Information Notes...
Page 80: ...wc_td000668gb_FM10 fm 80 Technical Data CRT48 Notes...
Page 93: ......
Page 106: ...AEM_ConcretePowerTrowel qxd 7 23 03 6 31 AM Page 1...
Page 107: ...CRT 48 Schematics wc_tx004197gb_FM10 fm 107 14 Schematics Notes...
Page 114: ......
Page 115: ......