background image

www.vsv-group.com

                                                                                                                         

 

9

2 - DIMENSIONS OF EQUIPMENT 

  

 
 
 
 

 

 
 
 
 

 

 
 
 
 
 
 
 
 
 
 
 
 

 

 

 
 

Summary of Contents for Aquatic U

Page 1: ...INSTALLATION AND USER S GUIDE FILTRATION BLOCKS Aquatic U 15 m3 hour Equipment of high alloy steel for cleaning and filtering water in the pool...

Page 2: ...www vsv group com 2...

Page 3: ...14 Differential switch 14 Other security measures 14 5 ELECTRICAL CONNECTIONS 15 20 Electrical control panel 15 Wiring diagram of the electrical control panel 16 Connecting boxes 17 18 Electrical wir...

Page 4: ...t a sufficient distance from parts made from stainless steel to avoid getting chemicals on stainless steel equipment Otherwise on the surface of stainless steel can form rust and turbidity 3 Spread th...

Page 5: ...r standard filter membranes 6 15 microns front skimmer nozzle LED lights 2x10W 10000K the device of automatic water adding the suction pipe with pre filter grounding bolt Technical part includes one s...

Page 6: ...hout heating BLOCK Aquatic U 15 m3 hour Total assigned power of 0 47 kW with spotlights 2 10W one speed pump 0 45kW 50Hz performance capacity 15 m3 hour height H max 13 5 m The technical part without...

Page 7: ...for use with boilers Heat transfer 15 kW min 70 kW max BLOCK Aquatic U 15 m3 hour heat exchanger Total assigned power of 0 473 kW with spotlights 2 10W one speed pump 0 45kW 50Hz performance capacity...

Page 8: ...unit capacity 9 kW BLOCK Aquatic U 15 m3 hour electric heater Total assigned power of 0 47kW with spotlights 2 10W 9 47kW with electric heater 9 kW one speed pump 0 45kW 50Hz performance capacity 15...

Page 9: ...www vsv group com 9 2 DIMENSIONS OF EQUIPMENT...

Page 10: ...the block on the wall of the pool as shown below taking care not to damage the waterproofing coating liner If necessary align it with the water level and fasten the block mounting bolts in a projecte...

Page 11: ...by sand VENTILATION Warning Never cover the ventilation holes in the lid of the technical compartment Otherwise the equipment will have to work with increased productivity which increases power consu...

Page 12: ...ble for water supply in your area Adding of water Bring the pipe to filtration unit and connect it to the inlet thread 3 8 inches provide a tight seal Filtration unit must be connected to the water su...

Page 13: ...le copper cable 2 x 2 5 mm2 One end of the cable must be in the technical part near the transformer of spotlight Other end must be near the terminals in the filtering part With the help of terminals m...

Page 14: ...cable is not protected you must install warning tape on top of the cable Under roads cables are laid at a depth of not less than one meter In all other cases the depth of the cable 0 6 m WARNING The t...

Page 15: ...www vsv group com 15 5 ELECTRICAL CONNECTIONS Electrical control panel...

Page 16: ...EL Connection of power supplies is made to the upper terminals of the differential switch observing polarity Power supply cable for pump and transformer of spotlight is connected to terminals accordin...

Page 17: ...or pump and transformer of spotlight in the technical part through O ring Tighten the nut of seal to avoid getting water into the technical part Enter the cable into the connection box and connect the...

Page 18: ...DIAGRAM of HEAT EXCHANGER Connect the filtration unit with electrical control panel according to this scheme electric control panel of filtration unit thermal protection switch switch heat exchanger...

Page 19: ...artment of filtration unit heat exchanger pump electronic thermostat suction pipe discharge pipe expansion tank filtration unit electrical control panel electromagnetic valve non return valve boiler 3...

Page 20: ...phase heater neutral phase ground neutral phase ground Electrical control panel neutral 3 phase ground neutral 3 phase ground main power supply main power supply to electric heater control box cable 2...

Page 21: ...ible hose in the discharge nozzle Enough to keep the hose near the discharge nozzle Stop filling pipelines by water when the air bubbles will stop After filling the pipeline make sure that no leaks in...

Page 22: ...ANING WARNING Replacing contaminated filter membranes can be performed only after turning off the filtration unit Switch off filtration equipment from power supply Remove the pre filter basket and rin...

Page 23: ...r supply clean or replace the filter membrane After cleaning swimming pool again turn off filtration unit remove the cover from the basket replace the dirty membrane on clean Then turn on filtering 9...

Page 24: ...ight and the size of the pool To measure the amount of chlorine you must use the test kits When pH adjusted Water volume Slow chlorination 40 m3 2 tablets 50 m3 2 tablets 60 m3 3 tablets 70 m3 3 table...

Page 25: ...a filtration mode Triggering of safety fuse 6A in the electrical control panel Replace safety fuse 6A 3 Filtration unit spotlight does not shine filtration unit is working Triggering of protection fu...

Page 26: ...during the winter Upon completion of the work do not forget to close the lid of filtration equipment and lock screws 14 Technical Support Center If you have questions or suggestions or need additiona...

Reviews: