www.vsv-group.com
11
Installation of the technical part
Preparation of the basis for technical compartment
The technical part should be installed in Zone 2 (VDE 0100-702). To install
the technical part, create a foundation of sand and rubble. Thickness of a
basis should provide the satisfactory base. Sizes of the pit should not restrict
your access for installation of the pipeline and electric cables. The upper
edge of the technical part without the cover should be the same level as
playground around swimming pool.
Align the technical compartment and make backfill by sand.
VENTILATION
Warning!
Never cover the ventilation holes in the lid of the technical compartment. Otherwise the equipment will
have to work with increased productivity, which increases power consumption and can cause overheating and
damage of motor.
Grounding
Perform the grounding of the filtration equipment according to the norms of your country.
Connect the filtration equipment to the ground by flexible copper wire cross section of 10
mm
2
.
WARNING!
Absence of grounding life-threatening.
If your filtration equipment is not connected to ground or incorrectly grounded, there is the
risk of corrosion because of the potential difference.
The manufacturer cannot be held responsible for any damages arising from absence of
grounding or an incorrectly grounding.