24
Condensation is drained away by connecting the hose
provided to the condensation drainage coupling.
To prevent formation of air locks a U-bend must be
created with the hose as shown in fig. 20.
Electrical connections
Power supply wiring: you will need a cable with
5 X 1.5mm
2
cores [4 plus earth] (fig. 21)
Connecting the power supply (N1, L1 and earth) and ma-
ximum speed terminals (fig. 22).
Wiring diagram with switch (fig. 23)
Wiring diagram with timer (fig. 24)
ENGLISH
19
20
60 mm
min.
21
22
23
24
Summary of Contents for VORT HR 200
Page 27: ...clean the heat exchanger re t the heat exchanger gs 34 35 36 ENGLISH 31 32 33 27 34 35 36...
Page 34: ...34 NOTE...
Page 35: ...35...