Engine installation
6
NOTE! Check that the rubber mountings are installed
so that they are not left under tension or side forces
when the engine has been installed and aligned in
relation to the propeller shaft.
When the engine has been installed, the two front
mountings should be equally loaded, as should the
two rear mountings be.
Measure the compression (B) of the engine mount-
ings on each side. The difference between port and
starboard mountings must not exceed mm (0.04").
Compare the sideways alignment of the front and
mountings of the front and rear mountings as pairs.
Adjust as necessary.
Tighten the top nut on each engine bed after align-
ment in relation to the propeller shaft. Check paral-
lelism of the engine bed
and check the loading of the
mountings.
Tightening torque:
300 Nm (220 lbf.ft).
300 Nm
(220 lbf-ft)
B
Summary of Contents for D11 series
Page 1: ...Marine Propulsion Diesel Engines Installation 1 1 D E D5 D16 series ...
Page 2: ......
Page 208: ...206 References to Service Bulletins Group No Date Concerns ...
Page 209: ...207 Notes ...
Page 210: ...208 Notes ...
Page 212: ...7748655 English 11 2007 ...