Pro
te
cte
d b
y c
op
yri
gh
t. C
op
yi
ng
fo
r p
riv
at
e
o
r c
o
m
m
e
rc
ia
l p
u
rp
o
s
e
s
, i
n
p
a
rt
o
r i
n
w
h
o
le
, i
s
n
o
t p
e
rm
itt
ed
u
nl
es
s a
ut
ho
ris
ed
by
Vo
lksw
agen
AG. Volkswagen AG doe
s not
gua
ran
tee
or a
cc
ep
t a
ny
lia
b
ilit
y w
ith
re
s
p
e
c
t t
o
th
e
c
o
rr
e
c
tn
e
s
s
o
f
in
fo
rm
a
tio
n
in
th
is
d
oc
um
en
t.
C
op
yrig
ht b
y V
olk
sw
age
n A
G.
Install in reverse order of removal.
Specified torque for bolts -4-: 18 Nm.
• It is essential that a functional test is then carried out because
the door lock is not released if the cables are not correctly
adjusted and locked and the door cannot then be opened.
2.10
Removing and installing bearing bracket
Note
Removal and installation are described only for the right door
handle bracket. The removal and installation of the left bearing
bracket is similar.
Jetta 2011 ➤ , Jetta Hybrid 2013 ➤
General body repairs, exterior - Edition 08.2012
2. Door components
143