Preparing for operation
16
Subject to modifications
US edition 2021/01
VOGT Air Lance Original operating manual
Contact:
+49(0)92 78-774 33-0
+49(0)92 78-774 33-11
www.vogt-tec.com
5 Preparing for operation
Before working with the VOGT Air Lance, it must be assembled and
connected to a suitable compressed air supply.
5�1 Mounting the VOGT Air Lance
Before use, the VOGT Air Lance has to be mounted. The exact procedure
differs depending on the type of the VOGT Air Lance:
Ejected parts or inadvertent triggering!
Risk of severe injury!
¾
Close the stop cock on the VOGT Air Lance before
mounting or replacing tools/components.
¾
Check the threaded connectors for secure seat-
ing.
VL 3�5 and VL 3�5 K
1. Slide the rubber protection cap onto the lance tube.
2. Depending on application and equipment:
−
Screw the standard jet pipe with nozzle onto the lance tube.
−
Screw the curved jet pipe with nozzle onto the lance tube.
−
Screw a nozzle onto the lance tube.
−
Screw an extension tube with the nozzle attached onto the lance
tube.
VL 3�5 S
1. Depending on application and equipment:
−
Screw the standard jet pipe with nozzle onto the lance tube.
−
Screw the curved jet pipe with nozzle onto the lance tube.
−
Screw a nozzle onto the lance tube.
−
Screw an extension tube with the nozzle attached onto the lance
tube.