Checks to the area
Prior to beginning work on systems containing flammable refrigerants, safety checks
are necessary to ensure that the risk of ignition is minmised. For repair to the
refrigerating system, the following precautions shall be complied with prior to
conducting work on the system.
2)
Work procedure
Works shall be undertaken under a controlled procedure so as to minimise the risk
of a flammable gas or vapour being present while the work is being performed.
3)
General work area
All mintenance staff and others working in the local area shall be instructed on the
nature of work being carried out. work in confined sapces shall be avoided. The area
around the work space shall be sectioned off. Ensure that the conditions within the
area have been made safe by control of flammable material.
4)
Checking for presence of refrigerant
The area shall be checked with an appropriate refrigerant detector prior to and
during work, to ensure the technician is aware of potentially flammable
atmospheres. Ensure that the leak detection equipment being used is suitable for
use with flammable refrigerants, i.e. no sparking, adequately sealed or intrinsically
safe.
5)
Presence of fire extinguisher
If any hot work is to be conducted on the refrigeration equipment or any associated
parts, appropriate fire extinguishing equipment shall be available to hand. Have a
dry power or CO2 fire extinguisher adjacent to the charging area.
6)
No ignition sources
No person carrying out work in relation to a refrigeration system which involves
exposing any pipe work that contains or has contained flammable refrigerant shall
use any sources of ignition in such a manner that it may lead to the risk of fire or
explosion. All possible ignition sources, including cigarette smoking, should be kept
sufficiently far away from the site of installation, repairing, removing and disposal,
during which flammable refrigerant can possibly be released to the surrounding
space. Prior to work taking place, the area around the equipment is to be surveyed
to make sure that there are no flammable hazards or ignition risks. NO SMOKING
signs shall be displayed.
7)
Ventilated area
Ensure that the area is in the open or that it it adequately ventilated before breaking
into the system or conducting any hot work. A degree of ventilation shall continue
during the period that the work is carried out. The ventilation should safely disperse
any released refrigerant and preferably expel it externally into the atmosphere.
Summary of Contents for HPS-120HM155AERI/I3
Page 2: ......
Page 53: ...VIVAX HR 50 DODATAK B Dijagram ožičenja s električnim upravljanjem 4 10kW ...
Page 57: ...VIVAX HR ...
Page 58: ... HR VIVAX 1 ...
Page 85: ...VIVAX HR 28 STRUKTURA IZBORNIKA PREGLED ...
Page 86: ... HR VIVAX 29 ...
Page 90: ...VIVAX ...
Page 141: ...VIVAX ENG 50 ANNEX B Electrically controlled wiring diagram 4 10kW ...
Page 145: ...VIVAX ENG ...
Page 146: ... ENG VIVAX 1 ...
Page 173: ...VIVAX ENG 28 MENU STRUCTURE OVERVIEW ...
Page 174: ... ENG VIVAX 29 ...
Page 178: ......
Page 196: ...3 4 3 4 3 4 ...
Page 199: ......
Page 200: ...ZZZ 9 9 FRP ...