21
3. Air purging.
Open the valves on the charging cylinder and the charge set. Purge the air by loosening the flare nut on
the 2-way valve approximately 45
’
for 3 seconds then closing it for 1 minute; repeat 3 times.
After purging the air, use a torque wrench to tighten the flare nut to on the 2-way valve.
4. Check the gas leakage.
Check the flare connections for gas leakage.
5. Discharge the refrigerant.
Close the valve on the charging cylinder and discharge the refrigerant until the gauge indicates 0.3 to 0.5
Mpa.
6. Disconnect the charge set and the charging cylinder, and set the 2-way and 3-way valves to the open
position.
Be sure to use a hexagonal wrench to operate the valve stems.
7. Mount the valve stems nuts and the service port cap.
Be sure to use a torque wrench to tighten the service port cap.
Be sure to check the gas leakage.
6.7 Balance refrigerant of the 2-way, 3-way valves
文件使用
"pdfFactory Pro"
试用版本创建
www.fineprint.cn
Summary of Contents for ACP-09CH25AEF
Page 2: ......
Page 15: ...12 4 Refrigerant Cycle Diagram PDF 文件使用 pdfFactory Pro 试用版本创建 www fineprint cn ...
Page 18: ...15 ACP 18CH50AEF ACP 18CH50AEG ACP 24CH70AEG ...
Page 42: ......
Page 43: ......
Page 44: ......