
7
IP DECT Deployment on Ships
A100K10676
The synchronization chain must always overlap with the base
-
station to sync on.
No. 0 is the Sync Master (can be numbered 0 to 255).
-
Other base stations are connected to the Sync Master through the
-
synchronization chain.
If one of the base stations in the synchronization chain is not
-
working, then all base stations behind are also not working.
Figure 3 Synchronization Chain Layout without Secondary Sync Ways
No. 0
●
is the Sync Master (can be numbered 0 to 255).
Green line
●
: Shows the primary sync ways.
Brown line
●
: Only handover overlap is needed.
Synchronization Chain With Secondary Sync Ways
3.3.2.2
Figure 4 Synchronization Chain with Secondary Sync Ways
No. 0 is the Sync Master (may be numbered 0 to 255).
-
No. 10 and No. 20: Primary and secondary sync on No. 0.
-
No. 11: Primary sync on No. 10 and secondary sync on No. 21.
-