
15
IP DECT Deployment on Ships
A100K10676
Main Deck
5.7
Base station 2 on the Main Deck has a primary sync with Sync Master 1
on the same deck. If this primary sync fails, then its secondary sync with
base station 11 on the Tween Deck will take over the synchronization.
Base station 13 has a primary sync with Sync Master 1. If this primary
sync fails, then its secondary sync with base station 12 on the Tween
Deck will take over the synchronization. There is one reserve PoE point
placed at a strategic location in case of potential coverage holes and a
base station needs to be installed.
Tween Deck
5.8
Base stations 11 and 12 on the Tween Deck form parts of two leaky
cable solutions. Base station 11 has a primary sync with Sync Master 1
on the Main Deck. If this primary sync fails, then its secondary sync with
base station 2 on the Main Deck will take over the synchronization. Base
station 12 has a primary sync with Sync Master 1. If this primary sync
fails, then its secondary sync with base station 13 on the Main Deck will
take over the synchronization. There are two reserve PoE points placed
at strategic locations in case of potential coverage holes and more base
stations or leaky cables need to be installed.
ROV WORKSHOP
OFFLINE ROOM
ENGINE
CONTROL
ROOM
OFFICE
LAUNDRY
2
2
1/11
1
Sync Master
PLM-43
Cabinet
PoE
PLM-43
Cabinet
MOON POOL
LIQUID MUD
LIQUID MUD
LIQUID MUD
LIQUID MUD
LIQUID MUD
LIQUID MUD
BRINE
BRINE
BRINE
BRINE
CEMENT
CEMENT
CEMENT
CEMENT
LEAKY CABLE
12
METHANOL
METHANOL
SPECIAL
PRODUCTS
SPECIAL
PRODUCTS
12
1/13
TWEEN DECK
WORKSHOP
ENGINE
STORE
DIESEL OIL TANK
HOT WATER
LUB. OIL
11
ENGINE ROOM
11
1/2
SWITCHBOARD
ROOM
LEAKY CABLE
PoE
PoE