14
A100K10676
IP DECT Deployment on Ships
Second Deck
5.5
Base station 4 on the Second Deck has a primary sync with base station
3 on the First Deck. If this primary sync fails, then its secondary sync
with base station 2 on the Main Deck will take over the synchronization.
There is one reserve PoE point placed at a strategic location in case of
potential coverage holes and a base station needs to be installed.
First Deck
5.6
Base station 3 on the First Deck has a primary sync with Sync Master
1 on the Main Deck. If this primary sync fails, then its secondary sync
with base station 15 on the Main Deck will take over the synchronization.
There is one reserve PoE point placed at a strategic location in case of
potential coverage holes and a base station needs to be installed.
CLIENT
CLIENT
CASINO
FIRST OFFICER
FIRST OFFICER
CREW
CREW
CREW
CREW
CREW
4
4
3/2
CREW
SECOND
DECK
PoE
3
Server 6000
+ ACM
INSTRUMENT
ROOM
ELECTRICIAN
HOSPITAL
STEWARD
SECOND ENGINEER
CREW
CABINS
CREW
CABINS
CREW
CABIN
FIRST
DECK
3
1/15
PoE