
22
A100K10676
IP DECT Deployment on Ships
Base station deployment on Aft Main Deck
Figure 13
In the example above, base station 13 is placed high in the cabin area
and installed in a plastic water-tight cabinet (type PLM-32 or PLM-43) to
shield it from the elements. The standard base station is directed out and
down towards the open Main Deck area.
Base station deployment on Main Deck
Figure 14
In the example above, base stations 2 and 13 should be air-synced with
the Sync Master (base station 1) in the cabin area which also covers the
Main Deck.
ROV WORKSHOP
OFFLINE ROOM
ENGINE
CONTROL
ROOM
OFFICE
LAUNDRY
2
2
1/11
1
Sync Master
PLM-43
Cabinet
PoE
PLM-43
Cabinet
ROV WORKSHOP
OFFLINE ROOM
ENGINE
CONTROL
ROOM
OFFICE
LAUNDRY
2
2
1/11
1
Sync Master
PLM-43
Cabinet
PoE
PLM-43
Cabinet