
COMPONENT TESTING INFORMATION
Continuity is indicated as 100
Ώ
and below. Each pad must be pressed to perform the following test.
Switch Matrix
Relay Drive Requirements
Relay drive requirements are defined as a percentage of on time based on a 60 second cycle.
Bake 100%
bake
Broil 100%
broil
Clean
Stage 1 - 100% broil, 0% bake, for 30 minutes
Stage 2 - 0% broil, 100% bake
50