Installing the Gate Operator
GATE OPERATOR INSTALLATION
STEP 3
Instal the Support Bracket:
a. Lubricate the Ball Bearing with silicone-based grease
and place it onto the pivot point of the Support Box.
b. Install the Support Bracket over the Ball Bearing and
pivot point of the Support Box.
STEP 4
Prepare a Gate Guide: Not Provided
a. Select the appropriate “U”-Channel profile steel to use
as a Gate Guide.
b. Weld the Guide to the Support Bracket.
c. Position the gate into the Gate Guide so that the axis of
rotation for the gate is plumb.
d. Through-bolt the gate to the Gate Guide. This will allow
for a slight amount of tolerance in case the axis of
rotation is slightly off centered.
min ⅜
13
≈ 1
½
C
≈ C
4a
STEP 1
Instal the Motor/Gear Assembly:
Position the Motor/Gear Assembly in the Support Box according to the opening
direction of the Gate
Open Right
Open Left
Close Position
STEP 2
Wire to the Junction Box:
a. Route the wires from the Motor/Gear Assembly through the conduit and up to the
Junction Box.
b. Connect the two wires to the wires coming from the Control Board.