
Page | 46
What does the priority list do? When the switch detects the power usage
is above 550 Watt (400 Watt for Vi35126), it will begin disabling ports,
until the usage goes down to safe levels again. The switch will start
disabling ports with low priority, and move towards the higher priority
ports. To reenable the disabled ports, user will need to log into switch to
re-enable the ports in the “PoE settings” page.
NOTE:
In the default mode, Port 1 is given the highest priority
and port 24 the least.
10.2 PoE Event
Counter
PoE Event Counter Definitions
E0: Port Overload (ICUT) Event
E1: Port Short Circuit Limit (ILIM) Event
E2: Port MPS Error (DC Disconnect) Event
E3: Port Severe Short Circuit Event
E4: Port Thermal Shutdown Event
E5: Port Temperature Limit Event
E6: Main Power Overload Event
E7: PoE Auto Check Timeout Event
Summary of Contents for MaxiiNet Vi30126 Series
Page 15: ...Page 15 Contact Information 126...
Page 19: ...Page 19 3 4 Vi30126 Front View 3 5 Vi30126 Rear View...
Page 34: ...Page 34 After logging in the following page will appear Full Version Lite Version...
Page 41: ...Page 41...
Page 42: ...Page 42 Section 10 PoE 10 0 PoE Status...
Page 44: ...Page 44...
Page 49: ...Page 49...
Page 55: ...Page 55 Duplex Select Full or Half Duplex for most application select Full...
Page 60: ...Page 60 11 2 Bandwidth Control...
Page 70: ...Page 70 NOTE all ports which are not excluded will be part of the VLAN...
Page 73: ...Page 73 13 1 Drop and Receive Packet 13 2 CRC error packet and Receive Packet...
Page 80: ...Page 80 Section 15 Security 15 0 MAC Address Binding...
Page 89: ...Page 89...
Page 93: ...Page 93...
Page 104: ...Page 104...