PRO S3 Graphics MaxWall
User Guide
7/7/2014
Page
54
54
6.3.3 Plan Pane
Figure 6.3-5
Plan window is the main user interface for editing the plan. It lists 24hours, user can drag model
from model list into plan window, and drag plan‟s bottom edge to adjust playback duration time.
User can open several plans to edit at the same time.
Right-click the model in plan window to appear the dialog box as shown below:
Figure 6.3-6
Show Property
Click this option to view the model properties.
Summary of Contents for PRO S3 Graphics MaxWall
Page 1: ...User Manual PRO S3 Graphics MaxWall ...
Page 31: ...PRO S3 Graphics MaxWall User Guide 7 7 2014 Page31 31 Figure 5 1 8 ...
Page 66: ...PRO S3 Graphics MaxWall User Guide 7 7 2014 Page66 66 Figure 8 1 3 Figure 8 1 4 ...
Page 67: ...PRO S3 Graphics MaxWall User Guide 7 7 2014 Page67 67 Figure 8 1 5 Figure 8 1 6 ...