7
Vitorond 200, VD2A Series Installation
5354 788 - 03
Safety
Important Regulatory and Safety Requirements
(continued)
Working on the equipment
The installation, adjustment, service, and maintenance
of this boiler must be performed by a licensed professional
heating contractor who is qualified and experienced in the
installation, service, and maintenance of hot water boilers.
There are no user serviceable parts on the boiler, burners,
or control.
Note :
The completeness and functionality of field supplied
electrical controls and components must be verified
by the heating contractor. This includes low water
cut-offs, flow switches (if used), staging controls,
pumps, motorized valves, air vents, thermostats, etc.
Ensure main power supply to equipment, the heating
system, and all external controls has been deactivated.
Close main oil or gas supply valve. Take precautions in all
instances to avoid accidental activation of power during
service work.
Technical literature
Literature for the Vitorond 200 VD2A boiler:
- Technical Data Manual
- Installation Instructions
- Service Instructions
- Operating Instructions and User’s Information Manual
- Positive Pressure Venting Systems installation
instructions
- Instructions of other Viessmann products utilized with
this installation
- Installation codes mentioned in this manual
Note :
Leave all literature at the installation site and advise
the system operator/ultimate owner where the
literature can be found. Contact Viessmann for
additional copies.
For installation of the heating system as a whole, please
refer to the technical literature of other System Technology
devices:
- Installation Instructions for Viessmann boiler control
- Installation Instructions for Viessmann indirect-fired hot
water storage tank(s)
- Installation Instructions for burner and accessories
Installation tools and materials
In addition to standard tools and safety wear typically
necessary to install the boiler, the following are needed
to perform the assembly of this cast iron sectional boiler:
- draw tool kit
- wood/rubber mallet and regular hammer
- half-round metal file
- flat chisel
- lacquer solvent
- linseed oil * with graphite based sealant*
- cleaning rags
* Do NOT use straight linseed oil.