Vitorond 200, VD2A Series Installation
5354 788 - 03
28
Connections
Boiler Control Installation
(continued)
1. Install the centre top panel.
2. Install rear top panel and fasten with long self-tapping
screws.
3. Install control and apply cover strip.
4. In Canada: Install oil door safety switch (see separate
installation instructions).
For electrical and boiler control connections,
see Installation Instructions of boiler control.
6. Remove two plugs located on the back of the boiler
control housing using a flathead screw driver.
Mount control housing on the side panel.
7. Secure control housing using two supplied screws.
8. Run capillaries and boiler temperature sensor through
7
/
8
in
. (
22 mm) opening on side panel and insert them
into the sensor well as far as possible.
IMPORTANT
During installation and orientation of all cabling and
capillaries, ensure placement away from high heat sources
such as the vent, the chimney, or supply/return piping.
9. Install top panel using B 3.9 x 30 sheet metal screws.
10. Mount Vitorond 200 name plate to front panel
as shown.
For electrical and boiler control connections,
see Installation Instructions of boiler control.
Note:
Illustration may be different from actual product.