Installation
Handling, Transport and Siting
Handling
Severe jolts can damage the combustion chamber.
Do not subject the boiler to any severe jolts during
handling and positioning.
Transporting the boiler
Transport the boiler to the installation location in an
upright position and, if possible, on the pallet.
The whole boiler can be lifted at lifting lugs
B
behind
insulation
F
.
IMPORTANT
1. Undo straps and remove box.
2. Remove the parts lying on the boiler.
3. Remove 2 screws
D
from the base rails.
4. Lift the boiler from the pallet and position it.
5. Screw in 4 adjustable feet
E
and position the boiler
with a slight tilt (approx. 0.5°) towards the front.
Note:
The slope is required for venting the boiler.
6. Remove the cleaning brush from the boiler and keep
it
safe.
Legend
A
Lugs for hand cart straps
B
Lugs for vertical lifting only
C
Transport aid (handle)
D
Screws with nuts for securing on the pallet
E
Adjustable feet
F
Insulation
It is essential to use appropriate lifting
devices certified of lifting a minimum
1500 lbs. (680 kg).