Switching the unit ON
Switch on the unit with the remote
control of the internal device.
See operating instructions.
Checking the system function (output test)
Allow the unit to operate in cooling
mode for at least 15 min at a high fan
speed.
Check the temperature of the inrush-
ing and blown-out air.
The temperature differential should be
at least 8 K.
Charging the external unit with refrigerant (if units/devices
must be separated)
If the external unit and the internal device must be separated, the external unit
can be charged with refrigerant.
1.
Set the system to cooling.
2.
Close the liquid valve (see Fig. on
page 9).
3.
Close the suction gas valve (see
Fig. on page 9), when the pressure
gauge of the gauge set (see Fig. on
page 8) indicates 0 bar.
4.
Undo the refrigerant lines.
Further details regarding the individual steps
(cont.)
14
Commissioning, inspection, maintenance
5692
687
GB
Summary of Contents for Vitoclima 300-S
Page 54: ...54 5692 687 GB ...
Page 55: ...55 5692 687 GB ...