10
Commissioning steps
Inspection steps
Maintenance steps
Page
•
1. Filling the heating system and checking the supply of ventilation air
•
•
•
3. Changing the language (if required)
................................................................................. 11
•
•
4. Setting the time and date (if required)
.............................................................................. 12
•
•
•
•
•
•
•
•
8. Function sequence and possible faults
........................................................................... 13
•
•
•
9. Testing the static and supply pressure
............................................................................ 14
•
10. Setting the maximum heating output
............................................................................... 15
•
•
11. Checking the combustion chamber pressure switch
..................................................... 16
•
•
12. Removing the burner and checking the burner gasket
.................................................. 18
•
•
13. Checking the burner gauze assembly and thermal insulation block
............................ 21
•
•
14. Checking and adjusting the ignition and ionisation electrodes
.................................... 24
•
•
15. Cleaning the combustion chamber and heating surfaces
............................................. 24
•
•
16. Cleaning the condensate drain system
............................................................................ 25
•
•
17. Cleaning the neutralising system (if installed)
................................................................ 26
•
•
18. Checking the condensate drain and neutralising system (if installed) for
•
•
19. Checking the gaskets and thermal insulation sections on the boiler side
•
•
20. Checking the flue gas damper and flue gas header
....................................................... 28
•
•
21. Checking the expansion vessel and system pressure
................................................... 29
•
•
22. Checking the water quality
................................................................................................ 29
•
•
23. Checking the mixer for ease of operation and leaks
...................................................... 29
•
•
•
24. Checking all connections on the heating water and DHW sides for leaks
•
•
•
25. Checking the safety valve function
•
•
•
•
•
27. Checking the firm seating of electrical connections
•
•
•
28. Checking all gas equipment for tightness at operating pressure
................................. 29
•
•
•
29. Checking the combustion quality
..................................................................................... 30
•
•
30. Checking the ventilation air apertures in the installation room (only for open flue
•
31. Matching the control unit to the heating system
............................................................ 31
•
•
33. Connecting the control unit to the LON
........................................................................... 33
•
34. Calling up and resetting the "Service" display
............................................................... 34
•
•
•
•
36. Instructing the system user
.............................................................................................. 35
Commissioning, inspection, maintenance
Steps – commissioning, inspection and maintenance
5839829