Commissioning the System with the Commissioning Assistant
Commissioning
Commissioning assistant
1. Open the gas shut-off valve.
2.
If the boiler has not been switched on yet:
Turn on the ON/OFF switch.
The commissioning assistant starts automatically.
If the boiler has already been switched on:
See chapter “Calling up the commissioning
assistant at a later point”, page 41.
3. Commission the boiler and follow the commissioning
assistant. See the overview below.
Note:
Depending on the type of boiler, the accessories
connected and other settings, not all menu
points will be displayed.
Note:
After the commissioning assistant has finished,
check that the actuators are connected and
operating correctly. Start the actuator test.
IMPORTANT
Commissioning assistant sequence Explanations and references
Commissioning
Language
With app
The boiler automatically switches on the WiFi access point.
Further commissioning steps according to the instructions of the Vitoguide
mobile app
Note:
Apps for commissioning and service are available for iOS and Android devices.
With programming unit
If commissioning is to be carried out at the programming unit of the boiler.
Units
Temperature
Length
Select the required units of measurement (e.g. °C or °F)
Date
Format
Date setting
Automatic summer/winter
changeover
Time
Format
Time changeover
Filling and purging
Gas type
If operating with LPG, switch to “LPG”
Altitude
Set the elevation of the boiler installation site
Continue in the commissioning assistant with Yes or end commissioning with No.
Only commission the boiler with a fully filled siphon trap.
Check that the siphon trap has been filled with water.