Filling the trap with water
Pour at least 10 oz (0.3 L) of water into the flue gas
connection.
During commissioning, flue gas may escape from the
condensate drain.
Always fill the trap with water before commissioning.
IMPORTANT
Note:
If there is a risk of frost, only fill the trap just before
commissioning.