62
Commissioning steps
Inspection steps
Maintenance steps
Page
•
•
•
19. Starting the heat pump
................................................... 76
•
20. Commissioning the system
........................................... 76
•
21. Ticking the heat pump type on the type plate of the
internal unit (as per external unit type plate)
•
•
•
22. Checking the heat pump for unusual noises (e.g.
operating noise of fan, compressor or pump); venting
again if required
•
•
•
23. Checking the system function (e.g. actuators,
temperatures, heat meter if applicable)
........................ 85
•
24. Instructing the system user
........................................... 86
Commissioning, inspection, maintenance
Steps - commissioning, inspection and…
(cont.)
5782 201 GB