![Videotec MAXIMUS MHX Instruction Manual Download Page 36](http://html1.mh-extra.com/html/videotec/maximus-mhx/maximus-mhx_instruction-manual_1015732036.webp)
EN - English - I
nstruc
tion manual
34
MNVCMHX_1706_EN
8 Instructions for safe
operation
8.1 Safe operation
Before proceeding with the following
operations, make sure that the mains
voltage is correct.
8.1.1 Commissioning
Read the whole of this user’s handbook very carefully
before starting the installation.
Make connections and tests in the laboratory before
carrying out installation on site. Use appropriate tools
for the purpose.
Test system operation for positive results before
closing the caps and allowing the presence of a
dangerous atmosphere.
Make sure that all the devices are certified for the
application and for the environment in which they
will be installed.
To reduce the risk of ignition don’t open the device
when a potentially explosive atmosphere is present.
After commissioning the system keep this handbook
in a safe place, available for later consultation.
8.1.2 Safety rules
Given the considerable weight of the system, use an
appropriate transport and handling system.
Before starting any operation, make sure the power
supply is disconnected.
Before powering the system, install an overload
protection device in the electrical equipment for the
building.
Make sure that all precautions for personal safety
have been taken.
Installation of the electrical equipment must comply
with the local legislation in force.
The device must be installed only and exclusively by
qualified technical personnel.
8.1.3 Explosion prevention rules
Use appropriate tools for the area in which you are
working.
Always remember that the device must be connected
to an appropriate earth conductor.
Before doing any technical work or maintenance
on the device, make sure that potentially explosive
atmosphere is not present.
Before starting any operation, make sure the power
supply is disconnected.
Do not open any kind of cap if there is a possibility of
your being in a potentially explosive atmosphere.
Make all connections, installation and maintenance
work in a non-explosive atmosphere.
9 Switching on
The unit is switched on by simply connecting the
power supply. To switch off the unit disconnect the
power.
9.1 Before powering the product
in an explosive atmosphere
Make sure that the unit and other
components of the installation are closed
so that it is impossible to come into contact
with live parts.
Make sure that the back flange is firmly
closed.
Ensure that the sealing of cable entry
systems (if any) has been performed
properly and the time of glue hardening
has been observed.
Make sure that the device has been
connected to an earth link as described.
Make sure that all parts are fastened down
firmly and safely.
Summary of Contents for MAXIMUS MHX
Page 2: ......
Page 4: ......
Page 8: ...EN English Instruction manual 6 MNVCMHX_1706_EN...
Page 48: ......
Page 52: ...IT Italiano Manuale di istruzioni 6 MNVCMHX_1706_IT...
Page 92: ......
Page 96: ...FR Fran ais Manuel d instructions 6 MNVCMHX_1706_FR...
Page 136: ......
Page 140: ...DE Deutsch Bedienungsanleitung 6 MNVCMHX_1706_DE...
Page 179: ...RU MAXIMUS MHX MAXIMUS MHXT...
Page 180: ......
Page 183: ...RU 5 MNVCMHX_1706_RU 13 2 1 39 13 2 2 39 13 2 3 39 13 2 4 40 13 2 5 40 13 3 41 13 4 41 14 42...
Page 184: ...RU 6 MNVCMHX_1706_RU...
Page 185: ...RU 7 MNVCMHX_1706_RU 1 1 1 INFO 2 3 J9 7 3 3 21 1...
Page 186: ...RU 8 MNVCMHX_1706_RU 40 C 60 C IEC EN 60079 14 4 4 2 12 24Vac 10 12Vdc 5...
Page 189: ...RU 11 MNVCMHX_1706_RU 4 4 1 MHX MHX AISI 316L 3 4 NPT IEC EN60079 14 5 4mm IP66 IP67 40 C 60 C...
Page 190: ...RU 12 MNVCMHX_1706_RU 4 2 02 01 03 04 09 10 05 06 07 08 11 2 1 2 3 4 12 5 V 6 A 7 8 W 9 W...
Page 192: ...RU 14 MNVCMHX_1706_RU 5 5 1 3 5 2 4 5 3 AISI 316L 7 5 m 14 m 5 5 4 Single Mode Multi Mode 6...
Page 193: ...RU 15 MNVCMHX_1706_RU 6 6 1 15A max 3mm...
Page 194: ...RU 16 MNVCMHX_1706_RU 6 2 6 2 1 6 2 2 6 3 6 4 4...
Page 205: ...RU 27 MNVCMHX_1706_RU 7 3 7 J10 BNC BNC J10 30 62 5 125 m 3km 9 125 m 69km ST 31...
Page 211: ...RU 33 MNVCMHX_1706_RU 7 3 15 43 7 3 12 31 8 9 12Nm max 44 7 3 16 45 J9 17 22 20 23 22 24...
Page 212: ...RU 34 MNVCMHX_1706_RU 8 8 1 8 1 1 8 1 2 8 1 3 9 9 1...
Page 215: ...RU 37 MNVCMHX_1706_RU 11 2012 19 RAEE 25cm 12...
Page 223: ...KO MAXIMUS MHX MAXIMUS MHXT...
Page 224: ......
Page 227: ...KO 5 MNVCMHX_1706_KO 13 2 4 40 13 2 5 40 13 3 41 13 4 41 14 42...
Page 228: ...KO 6 MNVCMHX_1706_KO...
Page 229: ...KO 7 MNVCMHX_1706_KO 1 1 1 INFO 2 3 J9 7 3 3 21 1...
Page 230: ...KO 8 MNVCMHX_1706_KO 40 C 60 C 40 F 140 F IEC EN 60079 14 4 4 2 12 24Vac 10 12Vdc 5 A...
Page 236: ...KO 14 MNVCMHX_1706_KO 5 5 1 3 5 2 4 5 3 AISI 316L 7 5 m 14 m 5 5 4 6...
Page 237: ...KO 15 MNVCMHX_1706_KO 6 6 1 15A 3mm...
Page 238: ...KO 16 MNVCMHX_1706_KO 6 2 6 2 1 6 2 2 O 6 3 6 4 4...
Page 249: ...KO 27 MNVCMHX_1706_KO 7 3 7 CPU J10 BNC BNC J10 30 3km 62 5 125 m 69km 9 125 m ST 31...
Page 255: ...KO 33 MNVCMHX_1706_KO 7 3 15 43 7 3 12 31 o 8 9 12Nm max 44 7 3 16 45 J9 17 22 20 23 e 22 24...
Page 256: ...KO 34 MNVCMHX_1706_KO 8 8 1 8 1 1 8 1 2 8 1 3 9 9 1...
Page 259: ...KO 37 MNVCMHX_1706_KO 11 WEEE 2012 19 EU 25cm 12 Troubleshooting...
Page 267: ......