Operator’s Manual Backhoe Series BH
- Page 44 of 91 -
Version 2.0
◼
To obtain a cleaner trench and avoid
the buildup of material directly in
front of the backhoe, crowed out and
completely curled the bucket while
starting to lift it from excavation. In
this way, excess material will fall back
into the excavation
Dumping the bucket
◼
To dump the bucket at the end of the
digging cycle, lift it clear of the trench
while crowding it out and swinging it
to the spoil pile.
◼
As the pile is approached, dump the
bucket. When the bucket is empty,
the dipper stick and bucket are in a
position to resume digging upon
return to the trench.
I M P O R T A N T N O T I CE :
•
Avoid constant jarring or hammering contact between the spoil pile and
the loaded bucket, as this may cause premature wear to the backhoe
pins and bushings.
Trenching between a building and open excavations
◼
Start the trench at the building.
Trench out halfway to the
excavation.
◼
Start trenching from the excavation
to the first trench.
◼
Dig toward the first trench until
there is enough room to move the
unit between the two grooves.
Summary of Contents for BACKHOE BH6
Page 1: ...Operator s Manual BACKHOE SERIES BH6 BH7 BH8 VERSION 2 0 EN 2022...
Page 6: ...Operator s Manual Backhoe Series BH Page 6 of 91 Version 2 0...
Page 89: ...Operator s Manual Backhoe Series BH Page 89 of 91 Version 2 0 Excavation Specifications BH6...
Page 90: ...Operator s Manual Backhoe Series BH Page 90 of 91 Version 2 0 Excavation Specifications BH7...
Page 91: ...Operator s Manual Backhoe Series BH Page 91 of 91 Version 2 0 Excavation Specifications BH8...