LIN-300 Protection Boxes_Installation - Rev. 0
O
3.2.2 Installation of the Protection Box
3.2.3
Supplies needed
•
(4) 3/4” flexible conduit liquid tight connectors
•
(2) hex machine screw nuts 1/4-20
•
(6) spring lockwashers 1/4”
•
(4) tooth lockwashers 1/4”
•
(5) bolts 1/4-20 x 5/8”
•
(1) bolt 1/4-20 x 1-1/4”
•
(4) concrete anchors
•
(2) copper lugs
•
(1) ground copper wire (5m)
•
(2) liquidtight strain relief connector
•
(2) nylon locknuts 3/4’’
•
(2) rubber adapters for liquidtight strain relief
connectors
Figure 12 : Protection Box -Installation kit
3.2.4 Tools needed
•
Drill bits 5mm (13/64’’) and 8mm (5/16’’)
•
Tap drill 1/4’’-20
•
Hammer drill
•
Drill
•
Concrete drill bit 8mm (5/16’’)
•
Punch
•
Ratchet set
•
3/4’’ conduit hole saw or knockout punch set for 3/4’’ liquidtight fittings