background image

 

2

Contents

 

page 

 
1

 

Boiler technical data .................................................................................................................................................................................... 3

 

2

 

Boiler Installation ......................................................................................................................................................................................... 5

 

2.1

 

Pedestal Installation ............................................................................................................................................................................... 5

 

2.2

 

Binding of the Boiler Body ...................................................................................................................................................................... 5

 

2.3

 

Installation of tubing, fittings and a well .................................................................................................................................................. 6

 

2.4

 

Installation of a partitioned horizontal draught interrupter ....................................................................................................................... 7

 

2.5

 

Installation of burner .............................................................................................................................................................................. 7

 

2.6

 

Thermal insulation of the boiler body...................................................................................................................................................... 7

 

2.7

 

Installation of the gas armature .............................................................................................................................................................. 8

 

2.8

 

Boiler casing installation ........................................................................................................................................................................ 8

 

3

 

Electrical Panel installation .......................................................................................................................................................................... 9

 

3.1

 

Installation of the Distributing Box .......................................................................................................................................................... 9

 

3.1.1

 

Electrical Panel installation ......................................................................................................................................................... 10

 

3.1.2

 

Completion of the Electrical Installation ...................................................................................................................................... 10

 

3.2

 

Version 10, 12, 15 links automatics HONEYWELL, valve HONEYWELL ............................................................................................. 11

 

3.2.1

 

Installation of the Distributing Box .............................................................................................................................................. 11

 

3.2.2

 

Electrical Panel installation ......................................................................................................................................................... 11

 

3.2.3

 

Completion of the Electrical Installation ...................................................................................................................................... 12

 

3.3

 

Version 10, 12, 15 links automatics HONEYWELL, valve DUNGS ...................................................................................................... 12

 

3.3.1

 

Installation of the Distributing Box .............................................................................................................................................. 12

 

3.3.2

 

Electrical Panel installation ......................................................................................................................................................... 13

 

3.3.3

 

Completion of the Electrical Installation ...................................................................................................................................... 13

 

4

 

Electrical connections flow sheet ............................................................................................................................................................... 14

 

 
 

 

Summary of Contents for G 90 10

Page 1: ...VIADRUS G 90 Manual for assembly of boiler GB_ _ND 2015_26 GB_2017_23 ND...

Page 2: ...al Panel installation 9 3 1 Installation of the Distributing Box 9 3 1 1 Electrical Panel installation 10 3 1 2 Completion of the Electrical Installation 10 3 2 Version 10 12 15 links automatics HONEY...

Page 3: ...x kW 71 87 105 127 Rated thermal output min kW 55 61 73 94 Volume gas flow at the maximum thermal output m3 h 1 7 16 9 25 11 32 13 61 Volume gas flow at the minimum thermal output m3 h 1 5 56 6 5 7 85...

Page 4: ...4 Number of sections 8 10 12 15 L mm 995 1155 1315 1555 L1 mm 815 975 1135 1375 A mm 878 5 941 941 941 D mm 200 200 225 250 Gas inlet...

Page 5: ...boiler 18 22 28 pc boiler inserts as per boiler size 3 pc anchoring screws M 10 x L as per respective size 1 pc mounting brace 2 pcs cover sheet metal lid 6 pc of washer 10 1 pc of completed boiler p...

Page 6: ...1 1 2 mount a complete distribution tube Into the threads G in the lower part of both end sections screw the outlet and inlet cocks Screw the cover sheet of the combustion chamber to the backside of...

Page 7: ...sheet metal screws Note at the 8 section the horizontal draught diverter is compact Installation of the horizontal draught interrupter 2 5 Installation of burner List of parts needed 1 pc burner comp...

Page 8: ...left side of the support in front fasten the side part of shell A left 2 into the riveting nut by means of 1 screw M5 and screw together by means of self drilling screws 4 2 with already fastened sid...

Page 9: ...on a side portion of the jacket left cover B Above a smaller console shall be installed to assist in securing the terminals 2 Sequentially 8 pc of entry bushing PG11 to be mounted on the distribution...

Page 10: ...nd piece of the tube PG 48 1 pc End piece of the tube PG 36 1 pc Nut of the end piece of the tube PG 36 Installation procedure 1 End pieces of the tubes PG36 and PG48 are to be fastened into the elect...

Page 11: ...x 7 Further line wires No 10 11 15 22 27 28 45 and 55 are connected to the ionization automatics 8 The remaining line wires put through the end piece of the protective tube PG48 and then the actual tu...

Page 12: ...6 1 pc Nut of the end piece of the tube PG 36 450 mm Protection tube PG 36 1 pc Ionization automatics HONEYWELL S 4563B1011 2 pcs Screw AM4 x 8 1 pc Bundle of conduits Installation procedure 1 With ai...

Page 13: ...ody 6 Cable cover tube PG36 should be fastened into end pieces situated on the Distribution Box and the Electrical Panel Console 3 3 3 Completion of the Electrical Installation List of parts needed 1...

Page 14: ...tion electrode F1 Fuse 4 A F2 Fuse 2 5 A H1 Signalling Boiler under voltage H2 failure signalling H3 ionising failure signalling S1 Main power switch S2 Reduced rated output switch S3 Pushbutton RESET...

Page 15: ...on box A1 Automatics Honeywell 4563B1011 F1 Fuse 4 A X10 Boiler s terminal plate Y1 Gas Valve Honeywell VR4601QB 2001 Z1 Anti interference element PS3 Minimal water level guard SP1 Minimal gas pressur...

Page 16: ...electrode F2 Fuse 2 5 A H1 Signalling Boiler under voltage H2 failure signalling H3 ionising failure signalling S1 Main power switch S2 Reduced rated output switch S3 Pushbutton RESET BT1 safety therm...

Page 17: ...signalling H3 ionising failure signalling S1 Main power switch S2 Reduced rated output switch S3 Pushbutton RESET X10 Boiler s terminal plate Y1 Gas Valve Honeywell VR4601QB 2001 Y2 Gas Valve Honeywe...

Page 18: ...eywell 4563B1011 F1 Fuse 4 A X10 Boiler s terminal plate Y1 Gas Valve Honeywell VR4601QB 2001 Y2 Gas Valve Honeywell VR4605QB 2002 Z1 Anti interference element PS3 Minimal water level guard SP1 Minima...

Page 19: ...ion electrode F2 Fuse 2 5 A H1 Signalling Boiler under voltage H2 failure signalling H3 ionising failure signalling S1 Main power switch S2 Reduced rated output switch S3 Pushbutton RESET BT1 safety t...

Page 20: ...ge H2 failure signalling H3 ionising failure signalling S1 Main power switch S2 Reduced rated output switch S3 Pushbutton RESET X10 Boiler s terminal plate Y1 Gas Valve Dungs MB ZRDLE 412B01S22 Z1 Ant...

Page 21: ...utomatics Honeywell 4563B1011 F1 Fuse 4 A X10 Boiler s terminal plate Y1 Gas Valve Dungs MB ZRDLE 412B01S22 Z1 Anti interference element PS3 Minimal water level guard SP1 Minimal gas pressure guard SP...

Page 22: ...oduct innovation these might not be included in this Manual hereto presented E1 Ignition electrode E2 Small burner ionization electrode E3 Burner ionization electrode F2 Fuse 2 5 A H1 Signalling Boile...

Page 23: ......

Page 24: ...VIADRUS G 90 VIADRUS a s Bezru ova 300 E mail CZ 735 81 Bohum n info viadrus cz www viadrus cz...

Reviews: