12
H2 - c.n. 19.40
H3 - c.n. 29.41
S3 - c.n. 27
S2 - c.n. 24,25
F2 - c.n. 6,7
4.
Green and yellow wire no.59 connect to the electrical panel console
5.
Green-yellow wire no.70 will connect the panel console with the Boiler body
6.
Cable cover tube PG36 should be fastened into end pieces situated on the Distribution Box and the Electrical Panel Console
3.2.3
Completion of the Electrical Installation
List of parts needed
1 pc
Electrical Panel
2 pc
Blank L&G large
1 pc
L&G small plug with thermomanometer
1 pc
Flexo cable
Installation procedure
1.
The sensing capillary of the instruments are to be inserted into appropriate wells, the manometer sensor then screwed into the return
valve.
2.
The electrical panel is to be mounted on the electrical panel console Insert into the electrical panel opening sequentially: the power
module, two large blanks L & G, and a small blank L & G with a thermo-manometer. Using the bushing PG11, put through the incoming
power cord into the distribution box and connect it to the terminal X10
Green-yellow
X10: PE
Blue
X10: N
Brown
X10: U
3.
Sockets X8.1 and X8.2 to be connected to the gas valve.
4.
Sockets X9.1 and X9.2 to be connected to the gas valve.
5.
Connector X6* to be connected to X6 socket.
6.
Connector X7* to be connected to X7 socket.
3.3
Version 10, 12, 15 links automatics HONEYWELL, valve DUNGS
3.3.1
Installation of the Distributing Box
List of parts needed
1 pc
Switch box
1 pc
Installation Console (large)
1 pc
Installation Console (small)
16 pcs
Screw AM5x8mm
16 pcs
Rosette washer Ø 5,2mm
1 pc
Cover plate DUNGS
2 pcs
Plug ST 18/3
1 pc
Plug ST1 8/4
8 pcs
Entry bushing PG 9
8 pcs
Entry Bushing PG11
1 pc
Fuse box
1 pc
Tube fuse 4A
1 pc
End piece of the tube PG 48
1 pc
Nut of the end piece of the tube PG 48
600 mm
Protection tube PG 48
1 pc
End piece of the tube PG 36
1 pc
Nut of the end piece of the tube PG 36
450 mm
Protection tube PG 36
1 pc
Ionization automatics HONEYWELL S 4563B1011
2 pcs
Screw AM4 x 8
1 pc
Bundle of conduits
Installation procedure
1.
With aid of 8 screws M5 with rosette washers, the installation console is to be mounted on a side portion of the jacket left cover B. Above,
a smaller console shall be installed to assist in securing the terminals.
2.
Sequentially, 8 pc of entry bushing PG11,to be mounted on the distribution box. Then, 8 pc of entry bushings PG9, end pieces of cover
tubes PG39 a PG48, a fuse box with 4A fuse, and two screws M5 are used to secure the cover DUNGS to the bottom of the distribution
box. The cover DUNGS, containing already installed from left the following ST 18/3 (X11), ST1 8/4 (X12), ST 18/3 (X13).
3.
And two rubber bushings Ø 13 mm.
4.
The box so equipped is to be mounted on a side part B left using four screws M5.
5.
At the box’s bottom on left, using two M4 screws, the ionization automatics HONEYWELL is to be fastened such, that the connector
leading to the igniter is orientated right down.
6.
The terminal X10 with conduits and suppression component Z1 is fastened into the lower portion of the installation console (Large) Anti-
jamming element is to be fastened using the fastener band to the console.
7.
Following the schematics, line wires 1, 2 are connected to the fuse box.
8.
Further line wires No.10,11,15,22,,27,28,45 and 55 are connected to the ionization automatics.
9.
Into the conductor plug X11, the line wires 20,46 and 61.
10. Into the conductor plug X12, the line wires 21,23,47 and 62.
11. Into the conductor plug X13, the line wires 26,48 and 63.
12. The remaining line wires put through the end piece of the protective tube PG48, and then the actual tube is inserted over the conductors.
13. Line wire 90, connected to the igniting electrode, is to be inserted through the rubber bushing Ø 13.
14. Conductor 91 leading to the guardian electrode and 92 to the burner, shall be put through the other rubber bushing Ø 13.