6
9.
Ensure that the sealant paste supplied by the manufacturer is providing a perfect seal.
10. Boiler body is to be fastened to the pedestal, using 4 pc of M8 x 25 bolts, M 8 nuts and washers Ø 8.
11. Boiler sealant then should be liberally and thoroughly applied to the contact surface between the protective pedestal cover and the boiler
body; excess glue to be removed.
12. Place plugging blanks to the openings in the bottom part of outer links and ensure good seal by using a silicone sealant supplied by the
manufacturer
2.3
Installation of tubing, fittings and a well
List of parts needed
2 pcs
of drain taps ID1/2”
1 pc
reducer G 1 1/2”/G 1”
1 pc
plugging stopper with external thread 1”
1 pc
attachable check valve with a manometer G 1/2
1 pc
four-seat well G 1/2”
1 pc
stopper plug G 1 1/2”
1 pc
of complete distributing pipe assembled with a
bent tube for return water (left or right styling)
1 pc
tubing for return water
4 pcs
screw M6
2 pc
of washer Ø 6
2 pc
of nut M6
2 pcs
of rosette washer 6
Right version
•
Mounting of left end section:
-
To the upper orifice G 1 1/2” mount tube Js 1 1/2“ for heating water.
-
To the lower orifice G 1 1/2” after mounting the distribution tube mount the reverse water tube Js 1 ½“ (plug welded on the tube
must be directed upwards).
•
Mounting of right end section:
-
To the upper orifice G 1 1/2” mount the reduction G 1 1/2" to G ½“.
-
To the reduction G 1 1/2"/G 1/2 mount the four-place reservoir G ½“.
-
To the thread G ½“ under the reduction G 11/2“ mount the check valve of the manometer.
-
To the lower orifice G 1 1/2" mount a complete distribution tube.
Into the threads G ½“ in the lower part of both end sections screw the outlet and inlet cocks.
Screw the cover sheet of the combustion chamber to the backside of the boiler drum by using 4 pc screws M6 with washers and nuts
Assembly of distribution tube (right)
Insert the plastic distribution tube into plug G 1“ with the opposite end than the rectangular cut out on the distribution tube, then insert it into
reduction G 1 1/2“/ 1/2“ a screw together. Insert the whole set of the distribution tube (with plug and reduction) into the do lower distance orifice
of the right end section and screw up (plug welded on the tube must be directed upwards).
Installation of heating water and reverse water tubes (right version)
Left version
•
Mounting of the right end section:
-
To the upper orifice G 1 1/2” mount tube Js 1 1/2“ for heating water.
-
To the lower orifice G 1 1/2” after mounting the distribution tube mount the reverse water tube Js 1 ½“ (plug welded on the tube must be
directed upwards).
•
Mounting of the left end section:
-
To the upper orifice G 1 1/2” mount the reduction G 1 1/2" to G ½“.
-
To the reduction G 1 1/2"/G 1/2" mount the four-place reservoir G ½“.
-
To the thread G 1/2“ under the reduction G 11/2“ mount the check valve of the manometer.
-
To the lower orifice G 1 1/2" mount a complete distribution tube.
Into the threads G 1/2“ in the lower part of both end sections screw the outlet and inlet cocks.
Screw the cover sheet of the combustion chamber to the backside of the boiler drum by using 4 pc screws M6 with washers and nuts
Heating water
tube Js 11/2“
left end section
reverse water
tube Js 11/2“
reduction G11/2“/G1/2“
right end section
distribution tube with a
plug G1“ and reduction
G11/2“/G1“