VIADRUS  G  50  is  a  cast  iron  boiler  determined  for  combustion  liquid  and  gaseous  fuels.  Two-  and  three- 
sectional  size  suits  the  reconstruction  of  heat  sources  in  smaller  houses  and  recreational  facilities.  Bigger 
sizes suit the requirements for heating of cottages, shops, schools etc. 
Boilers  are  only  manufactured  as  the  hot-water  type  with  forced  heating  water  circulation  and  working 
overpressure  up  to  do  400  kPa  (4  bar).  Before  the  dispatch  the  boilers  are  tested  for  tightness  by  testing 
overpressure 800 kPa (8 bar); they satisfy the insulation and transient resistance tests.  

 

Boiler advantages: 

 

1.  A high service life of cast-iron exchanger and all other parts with regard to the quality of used materials. 

2.  Efficiency above 90 %. 

3.  Reliability of regulation and security elements. 

4.  Simple operation and maintenance.  

5.  Low demand on chimney draught. 

6.  Output graduation by number of sections. 

3. 

VIADRUS G 50 boiler technical data  

 

 

Tab. no. 1  Dimensions, boiler technical parameters 

fuel value: natural gas33,99 MJ.m

-3

  

furnace oil extra light(TOEL) 42,7 MJ/kg  

Number of sections 

pc 

Boiler mass without burner 

kg 

165 

216 

270 

319 

367 

Water space volume 

27 

40 

53 

66 

79 

Diameter of smoke socket 

mm 

130 

130 

150 

150 

150 

Boiler dimensions: height x width 

mm 

785 x 600 

length (without burners) 

mm 

488 

638 

788 

938 

1088 

Heat-delivery surface 

m

2

 

1,05 

1,69 

2,33 

2,97 

3,61 

Combustion chamber volume  

m

3

 

0,009 

0,021 

0,032 

0,044 

0,056 

Combustion gas volume 

m

3

 

0,0186 

0,02586 

0,0331 

0,0403 

0,0475 

Combustion chamber depth 

mm 

205 

355 

505 

655 

805 

Opening for burner  

mm 

115 

Pressure loss on water side 

mbar 

0,15-0,5 

0,15-1,35 

0,15-1,40 

0,15-1,50 

0,15-2 

Testing water overpressure 

kPa (bar) 

800 (8) 

Working water overpressure 

kPa (bar) 

400 (4) 

Recommended heating water operating 
temperature  

°C 

50 – 80 

Safety thermostat setting 

°C 

100 

Pump thermostat setting 

°C 

45 

Stand-by waste  

kW 

0,2 

0,3 

0,3 

0,4 

0,5 

Pressure loss on flue gases side  

see Fig. no. 4 

Noise level 

dB 

See the burner documentation 

Chimney draught 

mbar 

Min. 0,05 

Min. 0,10 

Tensile loss 

mbar 

0,27 

0,28 

0,29 

0,3 

0,36 

Overpressure in the combustion chamber 

mbar 

0,11 

0,14 

0,18 

0,21 

0,26 

Boiler connections – heating and return water  

Js 

1“ 

1 1/4“ 

Connection voltage 

 

1/N/PE 230 V AC 50 Hz TN - S 

Electric input  

kW 

Max. 0,1 + burner input 

Electric coverage 

 

IP 40 

The values that depend on the type of used central burner are stated in burner documentation.  

 

Summary of Contents for G 50 Series

Page 1: ......

Page 2: ...allation 9 5 1 Rules and regulations 9 5 2 Positioning possibilities 11 6 Delivery and assembly 12 6 1 Delivery and accessories 12 6 2 Parts of boiler shell 12 6 3 Assembly procedure 13 7 Commissionin...

Page 3: ...pter no 9 Important warnings Please follow the under mentioned information and especially the prescribed annual check ups to be carried out an authorized firm in order to guarantee a long time and tro...

Page 4: ...mass without burner kg 165 216 270 319 367 Water space volume l 27 40 53 66 79 Diameter of smoke socket mm 130 130 150 150 150 Boiler dimensions height x width mm 785 x 600 length without burners mm...

Page 5: ...light number of sections 2 3 4 5 6 Boiler output kW 18 25 25 37 37 46 46 60 60 80 Recommended burner Bentone B 10 Bentone B 20 4 Description 4 1 Boiler construction The main part of the cast iron boi...

Page 6: ...fficiency are improved Tab no 5 Dislocation guide plates and turbulators Type of boiler G 50 2xxx G 50 3xxx G 50 4xxx G 50 5xxx G 50 6xxx Lower turbulator small 2 2 Lower turbulator big 2 2 4 guide pl...

Page 7: ...ion which reduces losses related to heat transfer into environment The boiler steel shell surface is painted by using a good quality comaxite paint Fig no 5 Flue gases turbulence in boiler drum 4 2 Co...

Page 8: ...tion pump run BT1 Safety thermostat BT2 Service thermostat BT3 Circulation pump thermostat MPH1 Service hours for 1 burner stage MPH2 Service hours for 2 burner stage KA1 Relay 2 of burner KA2 Relay o...

Page 9: ...testing and marking EN 303 2 Heating boilers Part 2 Heating boilers with forced draught burners Special requirements for boilers with atomizing oil burners EN 676 Automatic forced draught burners for...

Page 10: ...and solid fuel burning appliances having electrical connections EN 60445 ed 4 Basic and safety principles for man machine interface marking and identification Identification of equipment terminals con...

Page 11: ...terials of combustibility grade E F which quickly burn and burn themselves even after removal of ignition source such as paper cardboard asphalt and tar paper wood and wood fiber boards plastics floor...

Page 12: ...boiler drum can be handled by use of a hand pallet truck the boiler drum is put on a pallet or after the shells assembly there are installed the lifting lugs in the upper part of the boiler drum for i...

Page 13: ...it on the screw heads located in the upper section of shell side parts of the shell and fix by sliding backwards 12 Screw the upper rear part of the shell by means of 3 tapping screws to the upper par...

Page 14: ...burner with manual for burner operation and will ensure its guarantee and after guarantee repairs 2 Gas or furnace oil extra light TOEL connection to the burner and electric network 3 Boiler commissi...

Page 15: ...the dustiness the boiler must be put out of operation Even the partial impurities deposits on the burner will degrade the combustion process and threaten the economic and reliable boilers operation W...

Page 16: ...ulate the boilers thermal output 11 Instructions for product disposal after its service life VIADRUS a s is contractual partner of firm EKO KOM a s with client number F00120649 The packages comply wit...

Page 17: ...manufacturing factory The manufacturer requires for guarantee applicability In sense of Act no 222 94 Coll On business conditions and government administration in certified branches and on State elect...

Page 18: ...aging unit EN 13429 NO 3 1 Recovery by material recycling ensure recyclability in all terms of the standard for the functional packaging unit EN 13430 YES 3 2 Recovery in the form of energy ensure tha...

Page 19: ...months after the date it was dispatched from the manufacturing factory For boiler drum 5 years after the date its dispatch from the manufacturing factory The adjustment according to boiler operation...

Page 20: ...certificate for customer the user Record of accomplished guarantee and after guarantee repairs and regular product checpc Record date Carried out activity Contracting service organization stamp signa...

Page 21: ...ximum 30 months after the date it was dispatched from the manufacturing factory For boiler drum 5 years after the date its dispatch from the manufacturing factory The adjustment according to boiler op...

Page 22: ...22...

Page 23: ...m 30 months after the date it was dispatched from the manufacturing factory For boiler drum 5 years after the date its dispatch from the manufacturing factory The adjustment according to boiler operat...

Page 24: ...24 Date of revision 16 2013 model 2010 GB THERMODAL...

Reviews: