background image

 23

Intended for manufacturer  

VIADRUS a.s. 
Bezru

č

ova 300 

735 81 Bohumín 

 

Guarantee certificate and Quality and completeness certificate  

for VIADRUS G 50 … boiler 

 
 
Boiler serial number  

..............................…… 

Boiler output 

...................................... 

 
 

User (surname, name) 

……………………………………………………………………………… 

 
 

Address (street, town, postcode) 

……………………………………………………………………………… 

 
 

Telephone/Fax 

……………………………………………………………………………… 

  

Service gas overpressure:  

18 – 23 mbar natural gas 

furnace oil extra light  
according to burner documentation  

 

Boiler complies with requirements:  
EN 267  

Forced draught oil burners – Definitions, requirements, testing, marking 

EN 297  

Gas  –  fired  central  heating  boilers  –  Type  B

11

  and  B

11BS 

fitted  with  atmospheric  burners  of nominal heat 

input not exceeding 70 kW 

EN 303-1  

Heating  boilers  –  Part  1:  Heating  boilers  with  forced  draught  burners  –  Terminology,  general 
requirements, testing and marking 

EN 303-2  

Heating  boilers  –  Part  2:  Heating  boilers  with  forced  draught  burners  –  Special  requirements  for  boilers 
with atomizing oil burners 

EN 676  

Automatic forced draught burners for gaseous fuels 

 

VIADRUS a.s. provides the guarantee: 

 

For  boilers  24  months  after  the  boiler  putting  into  operation,  but  maximum  30  months  after  the  date  it  was 
dispatched from the manufacturing factory.  

 

For boiler drum 5 years after the date its dispatch from the manufacturing factory.  

 

The  adjustment  according  to  boiler  operation  manual  operation  and  installation  will  be  done  by  contractual 
service organization.  
The  completeness  including  the  standard  accessories  and  the  output  setting  according  to  „Operation  and 
installation manual“ is guaranteed by manufacturer through its contracting service organization. 
The guarantee certificate isn’t valid without having been filled in.  

Stoking test results: 

Measured values  

Numeric value  

Gas input pressure  

(mbar) 

 

pressure at the nozzle  

(mbar) 

 

Hourly consumption 

(m3. h

-1

, kg.h

-1

) 

 

 

 

 

 

The user confirms that: 

 

the boiler adjusted by the contracting service organization didn’t show any defect during the stoking test 

 

he received the „Operation and installation manual“ with properly filled-in guarantee certificate and Quality 
certificate  

 

he was made acquainted with boiler operation and maintenance  

 
 
 

……………………………………………… 

 
 
 

……………………………………………… 

 
 
 

……………………………………………… 

Manufacture date 

Manufacturer’s stamp 

Controlled by (signature) 

 
 
 

……………………………………………… 

 
 
 

……………………………………………… 

 
 
 

……………………………………………… 

Date of installation  

Installation company 

(stamp, signature) 

User’s signature 

 
 
 

……………………………………………… 

 
 
 

……………………………………………… 

 
 
 

……………………………………………… 

Date of putting into operation  

Contractual service organization 

(stamp, signature) 

User’s signature 

Summary of Contents for G 50 Series

Page 1: ......

Page 2: ...allation 9 5 1 Rules and regulations 9 5 2 Positioning possibilities 11 6 Delivery and assembly 12 6 1 Delivery and accessories 12 6 2 Parts of boiler shell 12 6 3 Assembly procedure 13 7 Commissionin...

Page 3: ...pter no 9 Important warnings Please follow the under mentioned information and especially the prescribed annual check ups to be carried out an authorized firm in order to guarantee a long time and tro...

Page 4: ...mass without burner kg 165 216 270 319 367 Water space volume l 27 40 53 66 79 Diameter of smoke socket mm 130 130 150 150 150 Boiler dimensions height x width mm 785 x 600 length without burners mm...

Page 5: ...light number of sections 2 3 4 5 6 Boiler output kW 18 25 25 37 37 46 46 60 60 80 Recommended burner Bentone B 10 Bentone B 20 4 Description 4 1 Boiler construction The main part of the cast iron boi...

Page 6: ...fficiency are improved Tab no 5 Dislocation guide plates and turbulators Type of boiler G 50 2xxx G 50 3xxx G 50 4xxx G 50 5xxx G 50 6xxx Lower turbulator small 2 2 Lower turbulator big 2 2 4 guide pl...

Page 7: ...ion which reduces losses related to heat transfer into environment The boiler steel shell surface is painted by using a good quality comaxite paint Fig no 5 Flue gases turbulence in boiler drum 4 2 Co...

Page 8: ...tion pump run BT1 Safety thermostat BT2 Service thermostat BT3 Circulation pump thermostat MPH1 Service hours for 1 burner stage MPH2 Service hours for 2 burner stage KA1 Relay 2 of burner KA2 Relay o...

Page 9: ...testing and marking EN 303 2 Heating boilers Part 2 Heating boilers with forced draught burners Special requirements for boilers with atomizing oil burners EN 676 Automatic forced draught burners for...

Page 10: ...and solid fuel burning appliances having electrical connections EN 60445 ed 4 Basic and safety principles for man machine interface marking and identification Identification of equipment terminals con...

Page 11: ...terials of combustibility grade E F which quickly burn and burn themselves even after removal of ignition source such as paper cardboard asphalt and tar paper wood and wood fiber boards plastics floor...

Page 12: ...boiler drum can be handled by use of a hand pallet truck the boiler drum is put on a pallet or after the shells assembly there are installed the lifting lugs in the upper part of the boiler drum for i...

Page 13: ...it on the screw heads located in the upper section of shell side parts of the shell and fix by sliding backwards 12 Screw the upper rear part of the shell by means of 3 tapping screws to the upper par...

Page 14: ...burner with manual for burner operation and will ensure its guarantee and after guarantee repairs 2 Gas or furnace oil extra light TOEL connection to the burner and electric network 3 Boiler commissi...

Page 15: ...the dustiness the boiler must be put out of operation Even the partial impurities deposits on the burner will degrade the combustion process and threaten the economic and reliable boilers operation W...

Page 16: ...ulate the boilers thermal output 11 Instructions for product disposal after its service life VIADRUS a s is contractual partner of firm EKO KOM a s with client number F00120649 The packages comply wit...

Page 17: ...manufacturing factory The manufacturer requires for guarantee applicability In sense of Act no 222 94 Coll On business conditions and government administration in certified branches and on State elect...

Page 18: ...aging unit EN 13429 NO 3 1 Recovery by material recycling ensure recyclability in all terms of the standard for the functional packaging unit EN 13430 YES 3 2 Recovery in the form of energy ensure tha...

Page 19: ...months after the date it was dispatched from the manufacturing factory For boiler drum 5 years after the date its dispatch from the manufacturing factory The adjustment according to boiler operation...

Page 20: ...certificate for customer the user Record of accomplished guarantee and after guarantee repairs and regular product checpc Record date Carried out activity Contracting service organization stamp signa...

Page 21: ...ximum 30 months after the date it was dispatched from the manufacturing factory For boiler drum 5 years after the date its dispatch from the manufacturing factory The adjustment according to boiler op...

Page 22: ...22...

Page 23: ...m 30 months after the date it was dispatched from the manufacturing factory For boiler drum 5 years after the date its dispatch from the manufacturing factory The adjustment according to boiler operat...

Page 24: ...24 Date of revision 16 2013 model 2010 GB THERMODAL...

Reviews: